BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 30, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a road / highway in Clayton, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of November 30, 2023, project was awarded to Byrne & Jones, awarded amount is $1,559,020.83.** The Scope of Work consists of a variable depth removal of the existing asphalt surface in order to correct the crown in the roadway, followed by replacement with a new 2" asphalt overlay for approximately 0.77 miles of roadway and the addition of concrete paver crosswalks. Replacement of underlying concrete slabs may be necessary in isolated locations as conditions require. Existing curb ramps will be replaced in order to bring them into ADA compliance and select signal components will require modification. Striping, traffic control and other items shall be included as shown in the specifications. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid in accordance with the Bidders Checklist. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher. The City of Clayton hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. The City of Clayton reserves the right to accept or reject any bid and the waive any irregularities in the best interest of the City. The DBE goal for this project is 12% No 2nd tier subcontracting will be allowed on this project.

Award

Roads / Highways

$1,559,021.00

Public - City

Paving, Site Work

46

8

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
1
Bidding Soon
965
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

March 19, 2024

Project location map

Multiple Locations, Clayton, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.