BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Summerland, British Columbia. Contact the soliciting agency for additional information.

The District requires a Contractor to promptly clear snow from municipal parking areas and access roads in approximately 19 locations. Snow clearing is on an as-needed basis depending on weather conditions. The Contractor shall supply necessary equipment and operators to remove and stockpile snow in the designated snow storage areas at each of the locations identified below ("Snow Clearing Locations"). Please see Appendix C for maps that identify the Snow Clearing Locations. Snow must be cleared from Snow Clearing Locations and stockpiled at the designated snow storage areas as soon as reasonably possible after the snow has reached a depth of 25mm. Snow clearing is required to take place seven days a week and must be completed prior to 7:00am, with the exception the Electrical Utility Division Pole yard which must be completed by 7:30am and the Summerland Landfill site which must be completed before 8:00am. Snow removal locations near the downtown core identified as areas 1-14 must be completed by equipment with bucket attachment or plough trucks assisted by equipment with bucket attachment to ensure proper stockpiling. During periods of heavy snowfall the Contractor may be required to provide additional snow clearing services later in the day. Only when District forces are unable to do so, and upon request by the District, the Contractor may be required to load stockpiled snow and haul and dispose of the snow at the designated snow dump area located at 8240 Peach Orchard Road, approximately 240 metres east of the underpass. Question Deadline 10/30/2023 at 12:00 AM PT The successful Respondent should be prepared to commence immediately. The Agreement shall be valid for a period of three (3) years with an option to extend for up to two (2) additional years upon mutual agreement by both parties.

Post-Bid

Sidewalks / Parking Lot

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
11
Bidding Soon
144
All Active Projects
65
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2023

December 4, 2023

img_map_placeholder

Multiple Locations, Summerland, BC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.