BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 20, 2025

Demolition, site work, renovation and addition to a water / sewer project in Freeport, Florida. Completed plans call for the renovation of a water / sewer project; for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

The Project Includes the Following Work: An Additional (Fourth) Cast-in-place Concrete Aerobic Digester Of258,000 Gallons Including Duplex Blowers, Duplex Sludge Transfer Pumps, a Mixer, and Associated Pipingand Electrical Work. This specification gives a general description of a prefabricated, enclosed, table-mounted, turn-key, direct driven, blower package system built by a single manufacturer. Blower, motor and silencers shall be mounted on a single base. The blower package system shall provide the system demand for air listed in these specifications. The manufacturer of the system shall provide a single source responsibility for the manufacture and service of the system. This specification covers the minimum requirements; however, it does not cover all details, which may vary in accordance with the requirements of the offered equipment. It shall be the responsibility of the Contractor to coordinate all the details required for a complete dewatering installation. The Contractor shall provide all work to properly install, adjust, and place in operation a complete working system. The entire blower package and its components shall comply with all applicable safety and environmental regulations. Bid Security Shall Be Furnished in Accordance With the Instructions to Bidders. For All Further requirements Regarding Bid Submittal, Qualifications, Procedures, and Contract Award, Refer to The instructions to Bidders That Are Included in the Bidding Documents. A Bid May Not Be Modified, Withdrawn or Cancelled by the Bidder After the Time and Date Designated Forthe Receipt of Bids and for 61 Days Thereafter Except as Provided in the Instructions to Bidders. The Owner Reserves the Right to Waive Irregularities and Informalities in Bids Received and to Reject Anyand All Bids and to Award the Contract Where It Appears to Be in the Best Interest of the Owner. This Project is Subject to the Build America, Buy America Act (Babaa) Requirements Under Title Ix of The infrastructure Investment and Jobs Act (Iija), Pub. L. 117-58, 70901-70953. Absent an Approved waiver, All Iron, Steel, Manufactured Products, and Construction Materials Used in This Project Must Be produced in the United States. Questions regarding the project must be submitted in writing to Philip Jones at pajones@dewberry.com by 5 p.m. CST pm CST on or before August 7, 2025.

Award

Water / Sewer

$3,947,000.00

Public - City

Addition, Demolition, Renovation, Site Work

41

22

2

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
59
Bidding Soon
755
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.