BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Hillsboro, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

Question Submission Deadline:November 6, 2023, 1:00pm Washington County Department of Land Use & Transportationurmd Safety Improvements: Sw 74th Ave. (Alden St. To House #7680) & Sw Alden St. (74th Ave. To 80th Ave.) URMD Safety Improvements: SW 74th Ave. (Alden St. to House #7680) & SW Alden St. (74th Ave. to 80th Ave.) The work to be done under this contract consists of the following in Washington County: 1. Construct roadway widening and improvements. 2. Construct curb and sidewalks. 3. Install piped storm water conveyance system. 4. Install signing. 5. Perform additional and Incidental Work as called for by the Specifications and Plans. The Project cost range is $1,000,000 - $2,000,000 PRE-BID MEETING The County will not hold a pre-bid meeting for this project. Bids must include: . A residency statement as defined in ORS 279C.365. . A bid bond on the County's Bid Guaranty form, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, certified check, or cashier's check, of at least ten percent (10%) of the total bid. Bids may be rejected by the County for non-compliance with prescribed public bidding procedures and requirements, and for good cause, upon a finding that it is in the public interest to do so. The County reserves the right to waive any irregularities or informalities. PROJECT STAFF WILL ONLY RESPOND TO QUESTIONS SUBMITTED IN WRITING Project Contacts: Charles Stearns, Project Manager 1400 SW Walnut St, MS #18 Hillsboro, OR 97123-5625 Phone: 503- 846-7936 Fax: 503-846-7810 Kira Furby, Engineering Associate 1400 SW Walnut St, MS #18 Hillsboro, OR 97123- 5625 Phone: 503-969-7990 Fax: 503-846-7810 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,738,000.00

Public - County

Paving, Site Work

192

17

21

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
27
Bidding Soon
509
All Active Projects
219
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2023

January 15, 2024

img_map_placeholder

Multiple Locations, Hillsboro, OR


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.