BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2024 at 7:00 PM

Updated January 27, 2024

Site work and paving for a civil project in Lynd, Minnesota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

**As of December 4, 2023, this project has not yet been awarded. The project is expected to be awarded on December 7, 2023. Lyon County Landfill Phase 9B-1 Construction Site Directions: Lyon County Sanitary Landfill, 2025 200th Ave, Lynd, MN 56157 The Contract provides for the construction of a new landfill cell, Phase 9B-1, over an old unlined landfill area. Construction of Phase 9B-1 includes stripping and stockpiling topsoil from the old unlined landfill cover, completing earthwork necessary to establish the Phase 9B-1 subgrade, installing a compacted low permeability material (clay) liner, geosynthetic clay liner, geomembrane liner, leachate collection piping system, granular drainage layer (sand), and related items. The Contract also includes the installation of new leachate recirculation manifold manholes, piping connections to the existing gas collection and control system, decommissioning of an existing leachate loadout pad, and dredging an existing sedimentation basin. The Contract also includes three alternative bid items, including a "waste push" upon completion of construction of Phase 9B-1 and certification of the cell by the MPCA to move waste from the existing Phase 9A and/or Phase 10A into the new Phase 9B-1 to establish 6-feet of waste placement in the new cell, fencing replacement and repairs, and installation of a new culvert at an existing sedimentation basin. The Contractor shall include furnish all supervision, labor, tools, equipment, transportation, storage facilities, services, and supplies required to complete the Work as indicated in the Contract Documents. The Work shall be Substantially Completed on or before August 30, 2024 and completed and ready for final payment in accordance with the GENERAL CONDITIONS on or before September 27, 2024. Questions shall be directed to: Tonya L. Koller, PE Burns & McDonnell tkoller@burnsmcd.com (952) 656-3615 Question Deadline 11/14/2023 The work by the Contractor includes but is not limited to, furnishing and paying for all materials, labor, transportation, and services necessary to complete the construction of the Project.

Award

Roads / Highways

$2,395,060.00

Public - County

Paving, Site Work

27

16

11

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
26
Bidding Soon
350
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2023

May 15, 2024

Project location map

2025 200th Ave, Lynd, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.