BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2023 at 7:00 PM

Updated April 10, 2025

Site work, paving and addition to a civil project in Belton, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; and for the addition of a road / highway.

The work consists of building an additional lane between Powell Parkway and I-49 southbound ramps, reconstruction of the Powell Parkway traffic signal, islands, removal of the Peculiar and Routh 58 intersection, 173rd street extension to Cunningham and reconfigure the Peculiar Drive and Cunningham intersection. Completion Date: October 1, 2024, except for traffic signal construction. Traffic Signal work shall be completed no later than 45 days after receiving the traffic signal poles, The bidder agrees that, should the bidder fail to complete the work in the time specified or such additional time as may be allowed by the engineer under the contract, the amount of liquidated damages to be recovered in accordance with Sec 108 shall be as follows: Liquidated damages per day $1625'' Direct all questions to Greg Rokos, Director of Public Works, at grokos@belton.org

Award

Roads / Highways

$3,797,559.00

Public - City

Addition, Paving, Site Work

160

8

14

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
66
Bidding Soon
1,090
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.