Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a municipal facility in Hesperus, Colorado. Completed plans call for the construction of a 1,500-square-foot municipal facility; and for site work for a municipal facility.
Reference Number 0000334287 Acceptance Deadline 11/17/2023 at 4:30 PM MT Questions are submitted online Yes Each offeror, before submitting a proposal, shall become fully informed as to the extent and character of work required. All questions must be submitted in writing via The total budget for design and construction is $200,000. Estimated contract start date Dec 4, 2023 Fort Lewis College has been awarded a Community Foundation grant to fund the construction of a community-based produce processing building. The project includes the design and construction of a metal building to receive, process and store produce grown on the . It will also serve as a community resource for specialty crop growers who wish to process larger quantities, especially during the winter. The of work for the contractor design/build team will be in accordance with State of Colorado and Fort Lewis College standards and specifications as follows: Provide and/or update utilities to the and building as required to include: water, electric, sewer and gas. Provide work and grading as required for metal building including concrete flooring with adequate water drains (see specifications). Design and installation of prefabricated metal building to receive, process and store produce grown on . (see specifications). Procurement of prefabricated metal building at least 1500 square feet, all structural elements must be metal. Installation of appropriate insulation, heat and fans. All improvements shall meet La Plata County code requirements. Once design is complete, the contractor shall provide a guaranteed maximum price for the construction of the project. The College reserves the right to negotiate any and all elements of this proposal.
Post-Bid
Municipal
$200,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 28, 2023
December 4, 2023
18683 CO-140, Hesperus, CO
Related To This Project
Hesperus, CO
Bid Date: Sep 01 2022
Hesperus, CO
Bid Date: Apr 21 2022
Bennett, CO
--
Colorado Springs, CO
Bid Date: Dec 29 2023
Fort Collins, CO
Bid Date: Nov 14 2023
Silverton, CO
Bid Date: Nov 08 2023
Loveland, CO
--
Glenwood Springs, CO
--
Colorado Springs, CO
Bid Date: Nov 30 2023
Thornton, CO
Bid Date: Nov 22 2023
Pueblo, CO
--
Colorado Springs, CO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.