BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Ellensburg, Washington. Completed plans call for the construction of a 750-square-foot playground / park / athletic field; for site work for a playground / park / athletic field; for paving for a road / highway; and water / sewer project.

Project Number - 22089 The Contractor shall do all work and furnish all tools, materials and equipment for: Bid Call 2023-12, Unity Park in accordance with the Contract Specifications, Contract Plans, 2023 WSDOT Standard Specifications for Road, Bridge, and Municipal Construction and the Contract Specifications, which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work provided under this contract and every part thereof. The Contractor shall provide and bear the expense of all equipment, work and labor any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work mentioned in the specifications in a professional and workmanlike manner. The Contractor shall complete its work in a timely manner and in accordance with the allowable working days submitted by the Contractor and approved by the City. Estimated project value is 1,800,000 to 2,400,000. The project consists of furnishing all labor, materials, equipment, and other miscellaneous items required to construct a new approximately 1/2 -acre park in Downtown Ellensburg. Site preparation includes demolition of onestory brick bank building and attached drive through bays, wood pavilion, asphalt parking lot, concrete walkways, and related features of the existing site. The park includes a comfort station building (with (2) two restrooms, storage/concierge space, mechanical chase, and drinking fountain), concrete flatwork plaza, permanent stage with backdrop wall, seat walls and curbs, permanent and temporary shade structures, site furnishings, natural turf event lawn, planting and trees, permanent irrigation system, event power, and site lighting; Utilities include new domestic water supply, sanitary sewer connections, storm connection and drains/structures, power supply, and conduit stub to future electric vehicle charging stations; and other miscellaneous items necessary to complete the project. All bid proposals shall be accompanied by a bid proposal deposit in a cashier's check or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Ellensburg. The engineer's range for the project is $1,800,000 to $2,400,000, plus tax (if applicable). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City of Ellensburg, Washington, reserves the right to reject any or all bids and to waive irregularities or informalities in the bid or in the bidding. Bid Results :: Schedule A :: Selland Construction, Inc. :: 2,484,528.00 Schedule B :: Selland Construction, Inc. :: 56,000.00

Award

Playgrounds / Parks / Athletic Fields

$2,540,528.00

Public - City

Demolition, New Construction, Paving, Site Work

73

31

35

6

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
17
Bidding Soon
423
All Active Projects
124
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 28, 2023

January 29, 2024

July 15, 2024

img_map_placeholder

401 N Pearl St, Ellensburg, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.