Published June 27, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Lewiston, New York. Completed plans call for site work for a water / sewer project.

The project involves upgrade of the comfort/fish cleaning station which includes the installation of a second lavatory with a separate entrance; replacement of the fish grinding equipment; and upgrade of the HVAC and electrical and lighting equipment. Alternates to the base bid work described above include removal and replacement of the north and/or south staircase and associated concrete slabs and site restoration, and/or providing a pavilion, concrete slab and associated site work. Total MWBE Participation Goals: 30% Service-Disabled Veteran-Owned Business Contracting Goal: 6% The successful bidder will be required to furnish a performance bond and payment bond, each in an amount equal to 100% of the total contract award amount. Questions regarding the Project should be directed to Christopher Freese at Nussbaumer & Clarke, Inc. (716) 827-8100, ext. 215, or by e-mail to cfreese@nussclarke.com.

Award

Water / Sewer

$213,800.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork, Wood Frames
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Metal Roof Panels
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Windows, Plastic Windows, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
142
Bidding Soon
2,954
All Active Projects
1,199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2024

July 10, 2024

img_map_placeholder

To Be Determined, Lewiston, NY

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Lewiston Landing Phase 5 - Rebid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.