BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Patterson, California. Completed plans call for site work for a water / sewer project.

***As of February 1, 2024. Project has been awarded to Arnaudo Construction, but award amount is not available. All communications relative to this WORK shall be directed to the ENGINEER prior to opening of the Bids. Stantec Consulting Services, Inc. 3301 C Street, Suite 1900 Sacramento, CA 95816 Attention: Stephen Chavez Telephone: (916) 869-8989 stephen.chavez@stantec.com Question Deadline Dec 06, 2023 DESCRIPTION OF WORK: The WORK includes construction of Pumping Plant No. 4 and Reach 4 Pipeline. The 195 cfs Pumping Plant No. 4 is a cast-in-place concrete structure containing five vertical turbine pumps. An electrical control building will be constructed to house the associated power supply and pump control equipment. The control building is comprised of a reinforced concrete slab-on-grade foundation, CMU block walls, and a structural steel roof system. The Reach 4 pipeline work consists of a 90-inch diameter cement mortar-lined and mortar-coated (CML-CMC) steel pipeline including PID lateral and customer turnout construction and tie-ins, electrical and SCADA communications, and work at the existing Locust Avenue well. The Reach 4 Pipeline alignment will run adjacent to the existing PID Reach 4 Canal and conclude with a reinforced concrete pipeline outlet structure at the Reach 5 Canal. Pipeline work includes 48-inch and 18-inch diameter CML-CMC steel piping at the new Pumping Plant No. 4. Various site improvements will be necessary at Pumping Plant No. 4 and No. 5 including removal of sediment from Settling Basin No. 3 at Pumping Plant No. 4 and from Settling Basin No. 4 at Pumping Plant No. 5. The existing Pumping Plants No. 4 and No. 5 will be decommissioned and includes the demolition and disposal of existing buried piping and concrete lined canal at the existing Pumping Plant No. 4 site immediately north of the new Pumping Plant No. 4 location, and removal of existing overhead electrical equipment at Pumping Plants No. 4 and No. 5. This work includes the removal and salvage of existing District pumps and equipment by the CONTRACTOR to be delivered to the District for storage at District facilities. SITE OF WORK: The Site of the WORK is located along the OWNER's main canal from the San Joaquin River in Stanislaus County, California, east of the City of Patterson. The overall Patterson Irrigation District (PID) Main Canal Rehabilitation Project involves the replacement of the Main Canal System from the existing Reach 1 headwall near the existing PID Fish Screen/Pumping Plant #1 on the San Joaquin River to the end of the Reach 5 replacement east of State Highway 33.

Award

Water / Sewer

$15,000,000.00

Public - City

Site Work

88

27

2

2

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
82
Bidding Soon
1,671
All Active Projects
720
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2023

February 12, 2024

img_map_placeholder

948 Orange Ave, Patterson, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.