BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 29, 2023 at 7:00 PM

Updated December 30, 2023

Site work and paving for a mixed-use development in New Buffalo, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

ACI JOB- 20-1600 211143/214041 3.00 mi of hot mix asphalt shared-use path including concrete curb, gutter sidewalk and ramp, signing and pavement markings on US-12 from Wunderlich Avenue to Smith Street and from Grand Beach Road to Wunderlich Avenue in the city of New Buffalo, Berrien County. This is a Local Agency project. Net classification required for this project is Comb/Jt. 3235 Cb, Ea or Comb/Jt. 3235 Cb, N9-6M or Comb/Jt. 3235 Ea, N9-6M In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and N9-6M. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec TAL 11011 TAL 11011 Job No 214041A 211143A Federal No 23A0439 23A0438 MI DOT - 2312 041 - Hot Mix Asphalt Shared-Use Path Including Concrete Curb, Gutter Sidewalk and Ramp, Signing and Pavement Markings on US-12

Award

Roads / Highways

$4,795,390.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
386
Active Projects
162
Bidding Soon
2,986
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2023

March 4, 2024

Project location map

US-12, New Buffalo, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.