BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2024 at 7:00 PM

Updated January 29, 2024

Renovation of an educational facility in Myrtle Creek, Oregon. Completed plans call for the renovation of a educational facility.

As of January 15, 2024, this project was awarded to Addcox Heating Center, awarded amount is not available. Myrtle Creek Elementary was built in 1949 and is one of three South Umpqua School District elementary schools. It is the only school that does not have cooling in the classrooms. The existing heating units in the attic are at the end of life, and it is time to upgrade the system to include cooling and heating via mini splits. An additional part of the RFP is determining the availability and cost to provide power to these units. A decommissioning and demolition/removal plan for the existing and previous heaters left in the attic will need to be developed and included in the RFP. We anticipate the project to be partially funded by Federal Grants. Therefore, the successful proposers will follow both federal and state regulations. Work includes providing equipment specified in Exhibit 1. Demo, recovery, and off-site disposal of the old units. BOLI prevailing wages included. Permits included. Electrical work included. Reuse disconnects if applicable. Start-up, test-out, and training. All work is to be done during the summer months, regular business hours, and no temporary cooling is provided. November 2023 : Scheduled Site Tours November 20-22nd. December 13th, 2023: RFP Questions Due by 2:00 PM December 20th, 2023: Proposals Scored December 27th, 2023: Notification of Apparent Successful Proposer January 5th, 2024: Post-Selection Review and Protest Period Ends January 10th, 2024: Respond to Post-Selection Review Comments February 7th, 2024: SUSD School Board approves Selected Proposer February 8th, 2024: Notice to Proceed given to RFP Successful Proposer June 10th, 2024: Work can begin. July 30th, 2023: Substantial Completion of project July 30th, 2024: A public Proposal opening will not be held. Proposals Questions and Proposal Protests due by: December 13th, 2023 @ 2:00 PM (PT) A performance bond and a payment bond, each in the amount of 100 percent (100%) of the total proposed price with a corporate surety approved by the Agency, shall be required for the faithful performance of the contract. The SUSD reserves the right to reject any or all Proposals. Site visits will be scheduled to not disrupt school while in session. Each submission in response to this RFP must be: 1) Submitted via email with a subject line: a. SUSD RFP # S-P10019-00008594. 2) Delivered by the date and time stated on the Cover Page. 3) Delivered to the individual listed on the Cover Page. 4) The file format must be PDF and may not exceed 10 MB.

Award

Educational

$200,000.00

Public - City

Renovation

3

5

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
9
Bidding Soon
204
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2023

June 10, 2024

Project location map

651 NE Division St, Myrtle Creek, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.