Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of a fire / police facility in Fort Worth, Texas. Completed plans call for the demolition of a fire / police facility; for the construction of a fire / police facility; and for site work for a fire / police facility.
As of July 12, 2024, this project has been awarded. Proposals from Construction Manager-at-Risk (CMAR) Offerors for the Replacement Fire Station 16 located at the Southwest Corner of Intersection of Horne Street and Lovell Avenue Fort Worth, Texas The last day for questions from prospective Offerors is at 5:00 PM on Friday, December 8, 2023. A final Addendum will be posted Tuesday December 12, 2023. The City will select the CMAR Contractor by using a two-step Request for Proposal (RFP) process. After evaluating the submitted Proposals from the CMAR Offerors, the City will shortlist the week of December 18, 2023, and interview up to three Offerors the week of January 8, 2024. The City will then select and enter into negotiations with the Best Value Offeror. The City may discuss with the selected Offeror, options for a scope or time modification and any price change associated with such modification. The selected CMAR Contractor will provide Pre-Construction Services including Constructability Reviews, Value Engineering Recommendations and Estimating Services Fees to review during the various phases of the design process. This project was initiated as a Design Build contract and has been converted to CMAR for contractual reasons. Programming and Schematic Design have been completed. Once the construction documents are completed, the selected CMAR Contractor will provide a Guaranteed Maximum Price (GMP) and construction performance period for the work. This GMP will be inclusive of Value Engineering and Estimating Services fees, General Conditions, Construction Managers Fee, contingency, bonds, insurance, and other agreed upon costs; plus, the Citys General Contingency Allowance. The total construction cost is anticipated to be approximately $6,550,000.00 refer to the Project Proposal Form found in the Instructions to Construction Manager-At-Risk (CMAR) Offerors The City of Fort Worth will negotiate a Pre-Construction Services Contract and later negotiate a Construction Services Contract, based on percentages established in the Project Proposal Form with the selected CMAR firm determined to have made the Best Value offer. The Business Equity goal is 25% for the estimated construction budget. There is no goal for the Pre-Construction Services. The goal will be applied to the GMP when the GMP agreements are reached. Offerors must submit an anticipated M/WBE Utilization Plan with their CMAR Proposal submittal. The submitted Plan will be part of the weighted selection criteria. Refer to Instructions to Construction Manager-at-Risk (CMAR) Offerors for additional information. Contact the Department of Diversity & Inclusion Office at (817) 392-2674 to obtain a list of certified subcontractors and suppliers. Upon completing the negotiations with the selected CMAR firm, the City will recommend to the City Council to award the CMAR contract to the selected CMAR firm based on the negotiations and the agreed upon estimated construction budget. The CMAR contract will be adjusted based on the agreed upon Guaranteed Maximum Price (GMP) after the design is completed. The selected CMAR Contractor will be required to provide Payment and Performance Bonds and provide Contractors General Liability and Statutory Workers Compensation Coverage once the GMP is agreed upon. CMAR Offerors may access the Instructions to Offerors, any Addendum, Sample Contract, General Conditions, Site Plans and other Reference Drawings, and any other related documents through the City For questions contact the City Project Manager, Don Isaacs, at (817) 392-8498 or email Donald.Isaacs@fortworthtexas.gov for assistance.
Award
Fire / Police
$6,550,000.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 14, 2023
April 15, 2024
Horne St & Lovell Ave, Fort Worth, TX
Related To This Project
Fort Worth, TX
Bid Date: Sep 19 2019
Fort Worth, TX
Bid Date: Jan 11 2024
Fort Worth, TX
Bid Date: Dec 07 2023
Fort Worth, TX
Bid Date: Dec 18 2023
Fort Worth, TX
Bid Date: Nov 16 2023
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Feb 11 2019
Fort Worth, TX
Bid Date: Oct 19 2020
Fort Worth, TX
Bid Date: Dec 07 2023
Fort Worth, TX
Bid Date: Nov 27 2023
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Nov 10 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.