BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 3, 2025 at 8:00 PM

Updated September 4, 2025

Site work for a mixed-use development in Burlington, Wisconsin. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

In general, the project consists of dam modifications and park improvements at Echo Veterans Memorial Park in Burlington, WI. Major project components include construction dewatering, steel sheet piling, cast-in-place concrete, crest gates, pre-cast concrete planks, fabricated steel railings, earthwork, asphalt and concrete pavements, permeable pavers, riprap, electrical work, lighting, turf replacement, and plantings. This project is funded in part by financial assistance from the Wisconsin Department of Natural Resources (WDNR) Municipal Dam Grant and the Knowles-Nelson Stewardship Grant.

Award

Playgrounds / Parks / Athletic Fields

$6,037,126.00

Public - City

Site Work

72

24

87

7

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
242
Bidding Soon
3,407
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

April 1, 2026

Project location map

589 Milwaukee Ave, Burlington, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.