Published December 26, 2023 at 7:00 PM

Updated January 29, 2024

Renovation of an educational facility in Iowa City, Iowa. Completed plans call for the renovation of a educational facility.

A. This section applies to all work under the fire suppression contract. This shall include, but not necessarily be limited to, the following: 1. Water Based Fire Suppression Systems 2. Demolition of Fire Suppression Systems B. The work shall include all materials, equipment and labor required for complete and properly functioning fire suppression systems. C. Drawings for fire suppression work are diagrammatic, intended to convey the scope of work and indicate arrangement of equipment, piping and sizes and locations of equipment and materials. D. Where job conditions require reasonable changes in indicated locations and arrangements, make such changes without additional cost to Owner. E. Because of the scale of the drawings, certain piping or items such as unions or fittings may not be shown, but where such items are required by other sections of the specifications, or where they are required by the nature of the work, they shall be furnished and installed. F. All elements of the construction shall be performed by workmen skilled in the particular craft involved, and regularly employed in that particular craft. All workers must possess State of Iowa Fire Marshal Fire Protection System Installer Certifications. Sprinkler contractor must have office within 125 mile radius of Iowa City limits G. All work shall be performed in a neat, workmanlike manner in keeping with the highest standards of the craft. Coordinate with project manager about loud work times, elevator usage, and protection of objects. All work shall be pre-inspected by job foreman prior to inspection final checkout. H. Where partial ceilings "clouds" are provided for architectural reasons, special attention shall be made to the design of the sprinkler system. Heads both above and below the ceiling shall be required where the ceiling is not continuous. I. Where lab benches, library stacks, shelving systems and other permanent furniture, equipment, fixtures or partitions extend within 18 inches of the ceiling, design the sprinkler head layout specifically to coordinate with the layout, lighting, ventilation, and other building features. J. Grid systems and looped systems are discouraged as they provide less long-term flexibility. John and Mary Pappajohn Biomedical Discovery Building Renovate Room L531 for Linear Accelerator

Award

Educational

$311,000.00

Public - City

Renovation

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
89
Bidding Soon
1,097
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2023

January 8, 2024

Project location map

169 Newton Rd, Iowa City, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.