Site work and paving for a sidewalk / parking lot in Ocean City, New Jersey. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reconstruction of the Ocean City Boardwalk From St. Charles Place to 5th Street The City of Ocean City is seeking a contractor to reconstruct the Ocean City boardwalk from St. James to 5th Street as outlined in the specifications and plans. The City is a subrecipient of the Boardwalk Preservation Fund Grant Program and has been awarded monies to reconstruct various sections of the boardwalk. This Grant program is disbursed through the American Rescue Plan Act - Coronavirus State Fiscal Recovery Fund (CSFRF) and thus has Federal requirements. concrete sidewalk, asphalt roadway, concrete curb , light fixture (furnished & installed), 4" schedule 60 pvc conduit (furnished & installed), 2" schedule 60 pvc conduit (furnished & installed), timber piles, 8 x 12 pile cap , 3 x 10 joist, 3" x 6" pt decking, railing, soil/sand removal/disposal from site Question Deadline 08/01/2025 at 2:00 PM ET Direct questions in writing to Purchasing Department, at the office of the Owner. CONTRACT DESCRIPTION: Work of the Project includes Ocean City Boardwalk reconstruction from 5th Street to St. Charles Place. C. The work of a single contract comprises the Project. 1.2 WORK BY OWNER A. Items noted NIC (Not in Contract) will be furnished and installed by Owner. 1.3 CONTRACTOR'S USE OF SITE AND PREMISES A. Limit use of site and premises to allow: 1. Owner occupancy of adjacent areas. 2. Work by Others and Work by Owner. 3. Use of adjacent site by the public 4. Owner will identify Contractor/Subcontractor Employee Parking5. 5. Owner will identify lay down area 6. Use of the existing restroom facilities by the contractor's and or subcontractor's employee's is prohibited. Contractor, within their bid, shall provide sufficient restroom facilities for utilization by the contractor's entire work force Project Start (+/-) October 1, 2025 Project Substantially Complete On or before April 3, 2026 Project Closeout On or before May 22, 2026

Award

Sidewalks / Parking Lot

$3,999,200.00

Public - City

Paving, Site Work

20

25

6

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
3
Bidding Soon
1,180
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

November 4, 2025

Project location map

Multiple Locations, Ocean City, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.