BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a stadium in Winkler, Manitoba. Completed plans call for the renovation of a stadium.

The existing Winkler Centennial Arena was built in 1967 and has a building area of around 3,440 sm / 37,028 sf. The primary structural and building envelope system of the existing arena is a prefabricated "Corespan" system consisting of deeply corrugated metal panels spanning the full height of the walls. The roof assembly is the same Corespan system, supported with steel trusses, that are encompassed with a flat bottom cord and curved top cord. The east end of the facility has a two-story component comprising of the main entrance/lobby, washrooms, offices, concessions, kitchen, arena box seating and general hall area. The Centennial Arena area consists of the main playing ice surface, bleachers and dressing rooms, mechanical room, and Zamboni storage. The Centennial Arena is connected to the Meridian Exhibition Centre and to a separate building containing the Manitoba Junior Hockey League (MJHL) Winkler Flyers training and dressing rooms. The general project scope includes the following: 1. Removal of the existing ice plant and tying the Centennial Arena into the new highly efficient consolidated twin pad ice plant system in the Meridian Exhibition Centre. 2. Removal of the existing boards, concrete slabs, bleachers, inaccessible change rooms/washrooms and lobby areas and replacement with new accessible viewing, modern inclusive change facilities, concessions, food services areas, multi-use spaces, sledge hockey dasher boards, and benches and arena seating. 3. General upgrades to the facility to improve energy efficiency; to bring the 55-year- old facility up to current codes and standards and address the building condition assessment (BCA) issues identified. The Project shall be designed and constructed, following best practice design strategies with a focus on environmentally friendly initiatives and energy efficiency to minimize operational costs to align with the Green and Inclusive Community Buildings Program (GICB). *Funding: Federal $8 million; Provincial $3.1 million; City $12.6 million. **The City of Winkler has signed a Letter of Intent with Bockstael Construction. Demolition to commence shortly & construction will be completed by the end of 2025.

Award

Arenas / Stadiums

$23,700,000.00

Public - City

Renovation

14

6

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
49
Bidding Soon
530
All Active Projects
227
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 6, 2023

October 1, 2024

December 31, 2025

img_map_placeholder

600 Park St, Winkler, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.