BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Georgetown, Colorado. Conceptual plans call for the renovation of a 5,000-square-foot fire / police facility.

Clear Creek County is seeking bids from qualified professional vendors for the application of paint material on walls and epoxy flooring (or equivalent) within the Clear Creek County Jail totaling approximately 5000 square feet. The qualified vendor must show possession of skills necessary to maintain and improve effectiveness, enhance its quality of services, minimize down time and support costs, and ensure security and safety controls at all times. The purpose of this Request-for-Bid is to obtain relevant information, credentials, qualifications, experience and a proposed Project Approach from interested Firms to inform the Board for selection of a consultant to inspect, design epoxy solution (or equivalent), apply epoxy (or equivalent) and paint surfacing, and warranty work and materials. SCOPE OF SERVICES Sheriff s Office Jail - Wall Painting & Flooring Recondition Project "" Normal working hours should be performed between 8am and 5pm Monday through Friday. "" Contractor shall provide paint and epoxy material (or equivalent) options to Sheriff s leadership for approval. "" Contractor shall comply with product manufacturer recommendation as included with the product. "" Obtain primary resinous flooring materials including primers, resins, hardening agents, grouting coats and topcoats through one source from a single manufacturer, with not less than ten years of successful experience in manufacturing and installing principal materials as described here. "" Comply with epoxy flooring (or equivalent) manufacturer s written instructions for substrate temperature, ambient temperature, moisture, ventilation and other conditions affecting applications. "" Perform testing of product as recommended by the manufacturer. "" Coordinate application of components to provide optimum adhesion of resinous product to substrate, and optimum intercoat adhesion. Cure epoxy product (or equivalent) according to manufacturer s written instructions. "" Treat floor drains to bridge potential cracks and to maintain protection. "" Remove temporary covering and clean resinous flooring just prior to final inspection. Use cleaning materials as recommended by the product manufacturer. "" A collaborative design process with Sheriff s Office leadership to design an epoxy (or equivalent) and paint solution which fulfills the needs of the Sheriff s Office staff as well as the security restrictions for inmates. "" Epoxy coating (or equivalent) shall be applied to provide sufficient coating and thickness and shall be coped/angled to allow to be applied at the base of the walls and to extend approximately 4 to the current height of existing floor. "" Contractor shall apply a heavier non-slip epoxy resin (or equivalent) at all floor areas. These areas shall be able to be mopped and cleaned. "" Contractor shall, at all times, take any and all steps necessary for maintenance and preservation of all adjacent County property. "" Contractor shall identify which employees will be working on this project including subcontractors. Those employees shall bring photo ID to obtain a County ID badge that shall be worn at all times while on the property. Contractor staff shall return all ID badges to designed personnel at the end of each work day. "" Contractor shall provide daily cleanup of work area and trash removal from the site. "" Provide needed ventilation equipment during application and curing processes. "" Project management: Provide complete project management support inclusive of weekly meetings, coordination, project administration, scheduling, budgeting, design review and closeout. "" Comply with all insurance requirements in accordance with Clear Creek County standards. "" Include an Owner s reserve and contingency amount to be controlled by Clear Creek County; each shall be 10% of the total GMP. "" Any needed demolition and waste disposal. "" Cost estimates. Firms may not contact any team members, staff or employees of Clear Creek County or other parties involved in this project. All communications regarding this project should be directed to: Facilities Maintenance Supervisor Charles Culp AND Captain Isaac Lucas. cculp@clearcreekcounty.us ilucas@clearcreeksheriff.us 303-679-2411 303-679-2407 Responses received after the deadline will NOT be considered and will be returned unopened. All timely and properly prepared Responses will be considered for evaluation. To view the entire Request-for-Bid, please follow online.

Project Abandoned

Fire / Police

$148,000.00

Public - County

Renovation

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
72
Bidding Soon
1,005
All Active Projects
436
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

March 22, 2024

img_map_placeholder

405 Argentine St, Georgetown, CO


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.