BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2025 at 8:00 PM

Updated March 15, 2025

Site work and new construction of a transportation facility in Toronto, Ontario. Design plans call for the construction of a 15,000-square-foot, two-story above grade transportation facility; and for site work for a transportation facility.

Development at 2, 4 and 80 Union St for construction of a SmartTrack Station to allow for housing development and growth within the neighbourhood. The station site runs roughly north-south, north of St. Clair, bounded to the north by the HONI corridor (and future Gunns Road Extension), with Union Street directly east, and Weston Road to the west. The station features 4 mainline tracks, 2 side platforms to serve 2 of the 4 Metrolinx tracks, each of which include canopy coverage over approx. 50% of the platform length, enclosures at the top of stairs and elevators, passenger shelters s well as typical amenities such as lighting, public address, digital and static signage, and snowmelt. Also planned, are 2 tunnels to connect each of the platforms to a station building on the east side of the rail corridor + modified main and secondary entrance buildings, which have been optimized to reduce building footprint. Corridor station facilities including 6-bay bus loop to accommodate TTC vehicle and Wheel Trans, a plaza, sidewalk, MUP and circulation space to accommodate all pedestrian and cycling activity, secure and covered cycling facilities, as well as landscaping, street furniture and plantings. TIMELINE: Designs are ongoing. Rezoning approvals are in place. The station is a priority for the city of Toronto for delivery through the SmartTrack Program by Metrolinx. The station will have a significant impact on housing development and growth potential, including future Transit Oriented Communities within the neighbourhood. A construction contract for this station may be announced Q1/Q2 2025. *This is a joint initiative of the Government of Canada, the Province of Ontario and the City of Toronto to improve transit for Toronto residents. *Construction cost is unreleased for publication.

Design

Transportation Terminals

$25,000,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
643
Active Projects
364
Bidding Soon
4,788
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2025

Project location map

2 Union St, Toronto, ON


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.