Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 20, 2023 at 7:00 PM
Updated January 29, 2024
Site work for a water / sewer project in Leighton, Alabama. Completed plans call for site work for a water / sewer project.
DBE/MBE Participation Goal: 2.5% WBE Participation Goal: 3.0% Contract "A" Principal Work: 1.Furnish (Only) Approximately 415 AMR Meters 2.Furnish Approximately 100 Meter Boxes 3. Furnish Data Collection Unit w/Start-Up and Support 4.Furnish Applicable Software 5.Furnish Ancillary System Support Contract "B" Principal Work: 1.Install (Only) Approximately 415 AMR Meters 2.Install Approximately 100 Meter Boxes 3.Install (Only) Backflow Valves 4. Install (Only) Curb Stops. LIQUIDATED DAMAGES WILL BE ASSESSED IF THE CONTRACT TIME IS EXCEEDED. The Supplier may apply for an extension of time in accordance with the provisions of the contract; however, such an extension must be approved prior to the contract completion date to avoid the imposition of liquidated damages. On Contract "B" the Contractor is hereby advised that TIME IS OF THE ESSENCE on this project and that the contract time of 60 consecutive calendar days total and noted restrictions shall be strictly observed. LIQUIDATED DAMAGES WILL BE ASSESSED IF THE CONTRACT TIME IS EXCEEDED. The Contractor may apply for an extension of time in accordance with the provisions of the contract; however, such an extension must be approved prior to the contract completion date to avoid the imposition of liquidated damages. The Contractor shall note that funds for this project are provided through DWSRF (Drinking Water State Revolving Funds). All applicable Federal guidelines must be met. The Owner reserves the right to reject any or all bids, to waive any informality in any bid, and to accept any bid considered advantageous to the Owner. There will be no Pre-bid Conference. Utility Engineering Consultants, LLC 130 South crest Drive, Suite 100 Homewood, AL 35209 Phone: (205) 951-3838 Fax: (205) 951-3839 Website: uecllc.com No bid may be withdrawn after the time for opening bids has passed. The Owner reserves the right to hold the bids for a period of sixty (60) days after the date of receiving Bids.
Post-Bid
Water / Sewer
$700,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 18, 2023
January 17, 2024
To Be Determined, Leighton, AL
Related To This Project
Leighton, AL
Bid Date: Jan 30 2024
Leighton, AL
Bid Date: Jan 30 2024
Leighton, AL
Bid Date: May 16 2024
Leighton, AL
Bid Date: Apr 11 2025
Leighton, AL
Bid Date: Jul 17 2025
Leighton, AL
Bid Date: Jul 15 2025
Leighton, AL
Bid Date: Jul 22 2025
Leighton, AL
Bid Date: May 04 2023
Mobile, AL
Bid Date: Dec 15 2023
Montgomery, AL
Bid Date: Jan 18 2024
Madison, AL
Bid Date: Dec 12 2023
Montgomery, AL
Bid Date: Sep 05 2024
Oneonta, AL
Bid Date: Jan 18 2024
Madison, AL
Bid Date: Dec 13 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
