BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Leighton, Alabama. Completed plans call for site work for a water / sewer project.

DBE/MBE Participation Goal: 2.5% WBE Participation Goal: 3.0% Contract "A" Principal Work: 1.Furnish (Only) Approximately 415 AMR Meters 2.Furnish Approximately 100 Meter Boxes 3. Furnish Data Collection Unit w/Start-Up and Support 4.Furnish Applicable Software 5.Furnish Ancillary System Support Contract "B" Principal Work: 1.Install (Only) Approximately 415 AMR Meters 2.Install Approximately 100 Meter Boxes 3.Install (Only) Backflow Valves 4. Install (Only) Curb Stops. LIQUIDATED DAMAGES WILL BE ASSESSED IF THE CONTRACT TIME IS EXCEEDED. The Supplier may apply for an extension of time in accordance with the provisions of the contract; however, such an extension must be approved prior to the contract completion date to avoid the imposition of liquidated damages. On Contract "B" the Contractor is hereby advised that TIME IS OF THE ESSENCE on this project and that the contract time of 60 consecutive calendar days total and noted restrictions shall be strictly observed. LIQUIDATED DAMAGES WILL BE ASSESSED IF THE CONTRACT TIME IS EXCEEDED. The Contractor may apply for an extension of time in accordance with the provisions of the contract; however, such an extension must be approved prior to the contract completion date to avoid the imposition of liquidated damages. The Contractor shall note that funds for this project are provided through DWSRF (Drinking Water State Revolving Funds). All applicable Federal guidelines must be met. The Owner reserves the right to reject any or all bids, to waive any informality in any bid, and to accept any bid considered advantageous to the Owner. There will be no Pre-bid Conference. Utility Engineering Consultants, LLC 130 South crest Drive, Suite 100 Homewood, AL 35209 Phone: (205) 951-3838 Fax: (205) 951-3839 Website: uecllc.com No bid may be withdrawn after the time for opening bids has passed. The Owner reserves the right to hold the bids for a period of sixty (60) days after the date of receiving Bids.

Post-Bid

Water / Sewer

$700,000.00

Public - City

Site Work

3

19

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
24
Bidding Soon
429
All Active Projects
165
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2023

January 17, 2024

img_map_placeholder

To Be Determined, Leighton, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.