BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2024 at 8:00 PM

Updated May 4, 2024

Site work for a water / sewer project in Freeland, Washington. Completed plans call for site work for a water / sewer project.

This project consists of preparing a drilling pad, and drilling, constructing, and testing an 8-inch well to a depth of approximately 300 feet below ground surface. The well will be constructed with a surface seal, 8-inch casing, and telescoping screen. The anticipated screen length is 20 feet. Upon completion of drilling and screen installation, the well will be developed and pump tests conducted. Flow rates are anticipated to be approximately 150 gpm. The Contractor shall provide all materials, equipment, and personnel for drilling, installing the well screen, and performing pumping tests. The Work shall be physically complete within 55 working days after the commencement date stated in the Notice to Proceed. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the Freeland Water & Sewer District and in an amount of not less than five percent (5%) of the total Proposal amount. If this Proposal is accepted and the undersigned fail(s) or refuse(s) to enter into a contract and furnish the required performance bond, labor and material payment bond, special guarantee bonds (if required), required insurance and all other required documentation, the undersigned will forfeit to the Owner an amount equal to five percent of the Proposal amount. The undersigned agrees that in the event it is Awarded the contract for the Work, it shall employ only Contractors and Subcontractors that are duly licensed by the State of Washington and remain so at all times they are in any way involved with the Work. The Freeland Water & Sewer District expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal. Bidders are encouraged to contact the Owner to schedule an appointment to visit the site prior to submitting a Proposal. To schedule an appointment, please call Mr. Andy Campbell, District Operations Manager at (360)-331-5566.

Award

Water / Sewer

$281,221.00

Public - State/Provincial

Site Work

6

13

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
100
Bidding Soon
1,693
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2024

August 5, 2024

Project location map

To Be Determined, Freeland, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.