BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2024 at 8:00 PM

Updated September 6, 2024

Site work, new construction, renovation and addition to a water / sewer project in Leonard, Texas. Completed plans call for the addition of a water / sewer project; for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of September 2024, this project is confirmed under construction. This Project is located at 17600 S. State Highway 78, Leonard, TX. Project increases the finished water treatment capacity of the plant by 70 mgd and includes construction of an Engineering Building, two chemical storage facilities, pretreatment basins, two gravity thickeners, filter complex, chemical injection vault, chlorine contact basin and clearwells, expansion of existing splitter box and thickened sludge pump station, installation of additional equipment inside multiple existing facilities to increase pumping and treatment capacity, and other miscellaneous improvements across the Site. Bidders must submit a cashier's check, certified check, or acceptable Bidder's bond with their proposal as a guarantee that the Bidder will enter into a contract for the Project within Owner within 15 days of Notice of Award of the Contract. The security must be payable to North Texas Municipal Water District in the amount of 5 percent of the Bid submitted. Contractor must execute the contract, bonds, and certificates of insurance on the forms provided in the Contract Documents. Performance and Payment Bonds are required, each in an amount of not less than one hundred percent (100%) of the contract price, conditioned upon the faithful performance of the Contract and upon payment of all persons supplying labor or furnishing materials. The North Texas Municipal Water District reserves the right to adopt the most advantageous interpretation of the Bids submitted in the case of ambiguity or lack of clearness in stating proposal prices, to reject any or all Bids, and/or waive formalities. Bids may not be withdrawn within ninety (90) days from date on which bids are opened. INFORMATIONAL SESSION: WEDNESDAY, DECEMBER 6, 2023 at 9:00 AM CENTRAL TIME Microsoft Teams Click here to join the meeting Meeting ID: 297 940 615 532 Passcode: Qrr35U

Under Construction

Water / Sewer

$290,955,000.00

Public - City

Addition, New Construction, Renovation, Site Work

1191

58

83

4

Subscribe For Documents

99 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
375
Active Projects
153
Bidding Soon
3,771
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2024

September 3, 2024

Project location map

17600 S State Hwy 78, Leonard, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.