BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work and new construction of a mixed-use development in Woodbridge, California. Completed plans call for the demolition of a fire / police facility; for site work for a fire / police facility; water / sewer project; and water / sewer project.

The district maintains four fire station locations. The purpose of this project is to provide construct a training tower with ARPA funds, provided by the San Joaquin County Board of Supervisors. The training tower will be constructed at our district headquarters, located at 400 E. Augusta Street, Woodbridge, CA 95258 ("jobsite"). The services to be provided will be overseen by the district's fire chiefs. A. All materials for the construction, except the steel building and all of its components are to be provided by General Contractor unless otherwise noted in this ITB. The building itself and all of its components will be supplied by the fire district. B. Pour a foundation based on plans from Mike Smith Engineering Plans and Soils Engineer. The current soil report calls for 4 feet of over excavation. This will be revised so bid should not include over excavation. C. The contractor shall be responsible for unloading all material for the training tower that will be delivered to the jobsite by (Undetermined). D. Construct the Fire Facilites Tower (Assistant Fire Chief model supplied by the district) according to plans. E. Build training tower according to Fire Facilites plans and warranty. F. Construccion to start around the third week of January 2024 (Aer Permits are issued). G. Total constructor should not be more than four (3) months. I. Add 60 AMP panel to exterior of building and add interior and exterior laughing (this specification is not in the plans. J. Dispose of all debris from jobsite. K. District is responsible for obtaining permits from the San Joaquin County Building Department. The district will also ensure final sign off by the County of San Joaquin County Building department at project completion. All fees associated with the permitting process will be paid by the district directly with the County of San Joaquin. This is a Public Works Project. The California Department of Industrial Relations ("DIR") requires the Woodbridge Fire Protection District ("District") to provide this notice to all contractors and subcontractors who bid or work on Public Works projects.

Award

Fire / Police

$150,000.00

Public - City

Demolition, New Construction, Site Work

57

6

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
95
Bidding Soon
1,879
All Active Projects
761
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2023

January 22, 2024

img_map_placeholder

400 E Augusta St, Woodbridge, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.