BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Pismo Beach, California. Design plans call for site work for a water / sewer project.

Per the owner, as of April 19, 2024, a design team has been selected and has been issued the contract for design. The owner states that they are hoping to have construction begin in the summer of 2024. Closed solicitation has been included below for reference. ……………….. The City of Pismo Beach is requesting proposals from firms for professional engineering services for the Bello Street and Wadsworth Avenue Water Main Replacement Project. The City is interested in acquiring the services of a qualified firm or a joint venture of firms to prepare final design plans and all necessary construction documents for the construction of improvements for the project. The selected consultant shall have relevant experience with the layout and design of public waterline improvement plans. For non technical questions, contact Erin Olsen at eolsen@pismobeach.org. For specific questions regarding the proposal please call Ben Fine at (805) 773-4656 or email bfine@pismobeach.org. The City of Pismo Beach (City) is interested in acquiring the services of a qualified firm or a joint venture of firms (Consultant) to provide to prepare preliminary and final designs, complete all necessary construction documents, and construction specifications for water system improvements involving the replacement of the existing water main within the water system. In general, the project includes the abandonment of a 6-inch pipeline through Judkins Middle School and replacing it with the installation of approximately 2,320 linear feet of 8-inch PVC water main. It is the Citys intent to complete this work while leaving the existing mains in service until the completion of the work. The work will take place in Bello Street and Wadsworth Avenue and should be completed by July 2024 to allow for the paving of Wadsworth Avenue prior to the start of the school year Select Consultant December 22, 2023-January 5, 2024 Award contract to Consultant January 16, 2023 Complete work 2 months The method of Contractor Selection has not been Determined at this time.

Design

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
15
Bidding Soon
226
All Active Projects
98
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

img_map_placeholder

Multiple Locations, Pismo Beach, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.