Demolition, site work and addition to a mixed-use development in Spring Lake, North Carolina. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

The project's scope of work is to add two group toilets in the classroom commons area of Building Two. Under slab rough-ins for new plumbing is to be completed by the general contractor and the appropriate subcontractors during the week (March 30th & 31st / April 1st -5 th weekdays / April 6th & 7th) spring break recess with the remaining work being completed during the 2024 summer recess. Site utility work outside the building can also be done during the 2024 summer recess. It is preferred that both interior under slab and exterior underground work be completed during the spring break recess. 1. Three references from previously satisfied public-school customers of similar size, scope & timeframe. 2. Furnish NC License Number (G.S. Chapter 87 establishes licensing requirements for general contractors for construction projects costing $30,000 or more). 3. All bidders & subcontractors shall hold the appropriate license as issued by the State of North Carolina to perform the work specified. 4. Insurance - The Contractor shall provide, as required by law, insurance for his employees. The Cumberland County Schools assumes no liability for injuries or accidents related to the Contractual Agreement. The Contractor shall furnish a certificate to the Owner (Cumberland County Schools) as a Proof of Coverage. The Contractor shall maintain and pay the Insurance Coverage, which shall not be less than the following: Workman's Compensation Employees Liability: $1,000,000.00 Bodily Injury: $1,000,000 per occurrence/ $2,000,000 aggregate Property Damage: $1,000,000 per occurrence/ $2,000,000 aggregate Owned/non-owned, and hired motor vehicle: $1,000,000 per occurrence/ $2,000,000 aggregate Excess liability coverage of $5,000,000 Cumberland County Board of Education shall be included as an additional insured on the policy. Such coverage for completed operations must be maintained for at least 2 years following final acceptance of the work performed under the Contract. 5. Recruitment of minority business participation in accordance with G.S. 143-128. Contractors interested in bidding the project must have experience and meet the qualifications required in undertaking a project of this type & size and to provide adequate and experienced roofing personnel to carry out this project within the timeframe established in the contract. No Bid Bond is required. A Performance Bond and Payment Bond, each in the amount equal to 100% of the Contract Sum will be required to be furnished with the execution of the construction contract. The Owner reserves the right to waive any informality or to reject any or all bids. No Bidder may withdraw his bid within 45 days after the actual date of the opening thereof.

Post-Bid

Educational

$400,000.00

Public - County

Addition, Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
53
Bidding Soon
1,330
All Active Projects
557
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2024

February 12, 2024

img_map_placeholder

612 Spring Lake Ave Spring Lake NC 28390, Spring Lake, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.