BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and new construction of a mixed-use development in Alturas, California. Working plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; and water / sewer project.

**As of March 28, 2024 no bids received for this project. As of this time it is unknown if and when project will rebid. This project is the CHAMBER Building & Structures portion of the larger $3,800,000 project listed below: The work, in general, to be done under this contract consists of the removal of an existing turf grass area, concrete sidewalk and slabs, sawcut asphalt pavement, trees, overhead lights, fencing and barbeques. As well as construct a pre-fabricated restroom, arched entry sign, playground structures (4), engineered wood fiber fall material, concrete pavement, decomposed granite surfacing, concrete seat walls, installation of shade structures varying in size (3), install fitness equipment (4), planter areas with trees, shrubs and ground cover, planting of natural turf fields, irrigation system for the site, small drainage system for the site, replacement of existing site amenities, installation of bollard solar lights; all within the confines of the Veterans Memorial and Dorris Park, 508 Main Street, Alturas, CA 96101 all in conformance with the attached Contract specifications entitled. Park Renovation at Veterans Memorial and Dorris Park Renovation located at 508 South Main Street, Alturas, California, 96101. PROJECT COORDINATION 1. Project Management: Modoc County Road Department will be managing the construction of the park and all contractors will be directing communication through Lilly Toaetolu - Project Manager and on site Project Supervisor: Bert Austin - Facilities Supervisor. Ryan Riedlinger - MDG will also be available for any design RFI/Clarifications. 2. Project Schedule: The project manager and supervisor will be coordinating all contractors and tasks per the master schedule and will require all tasks and contractor's schedules to be updated regularly. 3. Weekly Project Meetings: Once project contractors are on site there will be a weekly Monday meeting at the site or office to coordinate the week's tasks, material needs and deliveries. Each contractor will be responsible for coordinating its trade with the Project Manager / Supervisor and other trades to complete their tasks in proper construction order. 4. Clarifications / RFI's: To maintain a smooth-running project the contractors are encouraged to ask questions and clarify the designs early in the process and continually throughout the process. Please contact your PM team for assistance. An award of the bid, if a bid is awarded, will be made to the lowest responsible bidder with any combination of base bid and alternates, whose bid complies with all these documents, within 10 (or 60) days of the bid date. The County reserves the right to reject any bid which fails to meet bid requirements in any respect, all bids for any reason whatsoever and to waive minor irregularities in any bid. All bidders must provide a bid for the work described as the "Base Bid" and a bid for the work described as the "Alternate Bid", on the BID FORM. The bidder to whom a contract is awarded will be required to furnish, within 7 days of the Notice to Proceed, to the County evidence of insurance coverages, and performance/labor and material bonds in full conformance with the Contract Documents. SB854 NOTICE TO CONTRACTORS: The following requirements apply when: Work being performed is "Public Works" as defined in Section 1720 et. seq. of California Labor Code; and The total cost of the project (with or without materials) exceeds $1,000.00 NOTICE TO PROCEED / WORK TO COMMENCE (Pending weather and negotiation of schedule with County) January 17th , 2024 SUBSTANTIAL TARGET COMPLETION June 30, 2024

Final Planning

Playgrounds / Parks / Athletic Fields

$3,800,000.00

Public - County

New Construction, Outdoor Lighting, Paving, Site Work

38

17

6

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
35
All Active Projects
17
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 24, 2024

September 27, 2024

July 12, 2024

img_map_placeholder

508 S Main St, Alturas, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.