BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Seattle, Washington. Completed plans call for site work for a water / sewer project.

T-5 Intermodal Yard Improvements. The Port reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Port that such Bidder is properly qualified to carry out the obligations of the contract and to complete the Work contemplated therein. SCOPE OF PAYMENT The Contractor shall be compensated for performing the Work, including any changes made by Change Order, as provided for in this Contract. Payment of the Contract Sum shall constitute the full compensation to the Contractor for performance of the Work, including all risk, loss, damage, or expense of whatever character arising out of the nature of the Work or the prosecution thereof, and for all reasonable expenses properly incurred, including in the event of suspension or termination. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Engineer's estimate range for this project is $2.8M - $3.6M. The DBE utilization requirement is 8% for this contract. Each Bid shall be accompanied by a Bid security, cashier's check, money order, or surety bid bond, in the amount of not less than five percent (5%) of the total bid including Alternates, if any. A bid bond shall not be conditioned in any way to modify the minimum five percent (5%) required. If liquidated damages are provided in the Contract, the Contractor shall be liable for such liquidated damages until Substantial Completion of the Work, including a reasonable charge for the engineering, managerial and administrative costs incurred by the Port. After all the Work contemplated by the Contract has been completed, the Engineer will calculate the total expenses and damages for the completed Work. If the total expenses and damages are less than any unpaid balance due the Contractor, the excess will be paid by the Port to the Contractor. If the total expenses and damages exceed the unpaid balance, the Contractor and the Surety shall be jointly and severally liable to the Port and shall pay the difference to the Port.

Bid Results

Water / Sewer

$2,574,200.00

Public - County

Site Work

105

44

138

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
30
Bidding Soon
897
All Active Projects
381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

April 1, 2024

img_map_placeholder

2701 26th Ave SW, Seattle, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.