Renovation of a water / sewer project in Reading, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

**As of February 22, 2024, this project has not yet been awarded. The project is expected to be awarded on March11, 2024.** The project generally consists of providing all labor, equipment, and materials to perform the manufacturer-recommended repairs to the Komline Sanderson biosolids dryer and boiler package replacement in the Solids Handling Building at the wastewater treatment plant. Question Deadline 12/28/2023 at 4:00 PM ET All questions must be submitted through PennBid. The apparent low bidder and the next two lowest bidders must submit, to the Engineer, originals of the Bidding Documents within two (2) business days from the date of the bid opening. Reproduction of the Bidding Documents and placement on web sites other than PennBid, is not permitted. Bids may be modified or withdrawn at any time prior to the opening of Bids. After the Bid opening, Bids may be withdrawn only by complying with Commonwealth of Pennsylvania laws and regulations. A summary of such laws and regulations is given in the Instructions to Bidders (Document 00100). Bids shall remain open for a period of 60 days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. See Instructions to Bidders for other provisions on the time available for acceptance of Bids. The Contract will be subject to the Prevailing Minimum Wage Determination established by the Commonwealth of Pennsylvania, Department of Labor and Industry. Each Bid must be accompanied by Bid security in the form of a certified check, bank check, irrevocable letter of credit, or Bid bond (on the form included with the Bidding Documents) for (10) percent of the Bid total. It is a requirement of this Contract that at least 50% of the Work be performed by prime Bidder's own work force, not by subcontractor(s). It is a requirement of this Contract that Bidder shall have a minimum (5) year, (5) project documented experience in the type of Work required by this Project. Bidders, subcontractors, their workers and any persons providing labor and products to the Project shall be persons lawfully permitted to work in the United States and the Commonwealth of Pennsylvania. As a precondition of being awarded a Contract, Successful Bidder, and its subcontractor(s) are required, to provide confirmation of compliance with Act 127 of 2012, the "Public Works Employment Verification Act". The OWNER hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, or irregularities in any Bid.

Bid Results

Water / Sewer

$347,300.00

Public - City

Renovation

6

12

4

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
693
Active Projects
326
Bidding Soon
3,967
All Active Projects
1,881
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2024

February 5, 2024

img_map_placeholder

To Be Determined, Reading, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.