Published February 26, 2024 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a water / sewer project in Naperville, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

2024 Northwest Waterworks Improvements Phase II. Question Deadline 1/23/2024 @ 12:00 pm All questions concerning this bid shall be submitted in writing at least five business days prior to the online bid opening to Ryan La Russo at larussor@naperville.il.us. The deadline for questions. If required, a written response in the form of an addendum will be issued. No contact with the Water Utility Department shall be made during the bid process. Questions asked after the deadline are not guaranteed a response. a bid bond signed by a surety company authorized to do business in Illinois, a cashier's check or a certified check. For construction projects the bid deposit shall be in an amount equal to at least 10% of the amount of the bid. The scope of wiring and allowance is limited within the SCADA panel and telemetry enclosure. Any wires, equipment and conduits outside the above enclosures are within Contractor's scope, can not be included in the allowance. If total cost for an allowance item is less than the allowance price, the Contractor shall refund the remaining portion back to the owner upon completion of the project. If actual cost exceeds the allowance cost, a change order needs to be submitted for any additional cost beyond the allowance amount. All Overhead and Profit including bonding costs shall be included in the Base Bid amount and shall not be included in the Allowance amount. The City of Naperville is accepting sealed bids from qualified vendors to supply labor, equipment, supplies and material associated with the 2024 NORTHWEST WATERWORKS IMPROVEMENTS PHASE II project. The work generally consists of the installation of three VFDs as shown on the engineering plans and noted in the specifications. It also consists of replacing associated pipes, valves, lighting, electrical conduits, concrete, and cables. Painting services are also included. SCOPE OF WORK A. Furnish all materials, labor, equipment, and incidentals required and perform all the painting necessary to complete this Contract in its entirety as specified herein. B. It is the intent of this Section to paint all existing walls, floors, and ceilings in the pump room, and all new valves and pipe supports, all as specified in the painting schedules included in the engineering plan and all other work obviously required to be painted unless otherwise specified. Minor items not mentioned in the schedule of work shall be included in the work of this Section where they come within the general intent of this Section as stated herein. liquidated damages. Liquidated damages for delay in the completion of the project, but not as any other damages for non-conformance, shall be as follows: Substantial Completion: Two Thousand Five Hundred Dollars ($1,000.00) per calendar day. City as liquidated damages, it being now agreed that said sum is a fair estimate of the amount of damages that said City will sustain due to the bidder's failure to furnish said bonds. The City reserves the right to reject any or all bids or to waive any nonconformity in bids received whenever such rejection or waiver is in the best interests of the City.

Bid Results

Water / Sewer

$1,188,888.00

Public - City

Renovation, Site Work

16

18

25

5

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
158
Bidding Soon
2,287
All Active Projects
1,033
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

February 29, 2024

img_map_placeholder

Multiple Locations, Naperville, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 Northwest Waterworks Improvements Phase II

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.