Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 23, 2024 at 7:00 PM
Updated February 24, 2024
Site work and new construction of a mixed-use development in Watford City, North Dakota. Completed plans call for the construction of a playground / park / athletic field.
Bid Package #4 - Electronic Billboard Direct all bids/inquiries to the construction manager. Estimate = total project construction cost estimate. The official project start date was September 2021. All material, equipment, and labor as required for a complete installation unless specifically requested otherwise. 2. Verification and acknowledgment of existing site conditions. 3. Layout and coordination with all other trades. 4. Qualified supervision on site during work 5. Off-site housing for own workforce 6. Field measurements as required 7. Submittals / shop drawings per contract documents. Subcontractor to provide all submittals within 2 weeks of receiving Letter of Intent/subcontract (whichever is received first). 8. Insurance per FCI requirements 9. Immediately address defective or substandard work 10. All equipment required to complete own work, including lifts and hoists 11. Daily cleanup of own materials 12. Materials delivered to the project site (freight) 13. All inspections required for own work, both local and state inspections/tests (as applicable). Subcontractor will be responsible for calling in own inspections. Subcontractor to communicate inspection dates and inspection results with FCI superintendent . Question Deadline 01/03/2024 at 3:00 PM MT Questions regarding the project shall be addressed to Matt Lierz, FCI Constructors, Inc. mlierz@fciol.com or 701-713-4119. Please do not contact the architect or owner directly. Questions will be answered in the form of Addenda. Questions must be turned
Award
Amusement and Recreation
$60,000,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 10, 2024
March 11, 2024
Multiple Locations, Watford City, ND
Related To This Project
Watford City, ND
Bid Date: Nov 13 2020
Watford City, ND
Bid Date: Feb 29 2024
Watford City, ND
Bid Date: Feb 29 2024
Watford City, ND
Bid Date: Mar 21 2024
Watford City, ND
Bid Date: Apr 17 2024
Watford City, ND
Bid Date: Apr 16 2024
Watford City, ND
Bid Date: Apr 11 2024
Watford City, ND
Bid Date: May 02 2024
Watford City, ND
Bid Date: Feb 12 2024
Watford City, ND
Bid Date: Dec 07 2023
Watford City, ND
Bid Date: Dec 07 2023
Watford City, ND
--
Watford City, ND
Bid Date: Nov 24 2023
Watford City, ND
Bid Date: Nov 28 2023
Watford City, ND
Bid Date: Nov 17 2023
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
