Renovation of an educational facility in Roselle, Illinois. Completed plans call for the renovation of a educational facility.

FaCS Renovations at Lake Park High School West Campus Rebid The Scope of Work: Interior renovation of the existing Family and Consumer Sciences area into a new Culinary Arts Lab & support spaces at Lake Park West High School. In addition to new kitchen equipment, included, but not limited to, are the following required trades: - Demolition - Cast-in-Place Concrete - Gypsum Board Assemblies - LVT & Quarry Tile - Acoustical Lay-in Ceiling System - Interior Painting - Signage - Fire Protection Specialties A Performance and Payment Bond In the Full Amount of the Contract Will Be Required. A Bid Security of 10% of the Bid is Required With the Proposal. The Contractor Must Pay the Prevailing Wage Rates for All Work Per Illinois Law. It is the Policy of Lake Park Community High School District 108 to Provide Equal Opportunity to All Qualified Business in the Awarding of Contracts and Accordingly Promotes the Utilization of Diversified Businesses to the Maximum Extent Feasible in Any Contract Issued Against This Solicitation to Bid. The Owner Reserves the Right to Reject Any or All Bids, to Waive Irregularities in the Bidding Procedure, or Accept the Bid That in Its Opinion Will Serve Its Best Interest. Any Such Decision Shall Be Considered Final. The Owner Reserves the Right to Set Aside a Bid From a Contractor Who, in the Owner's Opinion, Does Not Exhibit Past Experience Equal to the Size and Scope of This Project. Prevailing Wage Law: This Contract Calls for the Construction of a "Public Work," Within the Meaning of the Illinois Prevailing Wage Act, 820 Ilcs 130/.01 Et Seq. ("the Act"). The Act Requires Contractors And Subcontractors to Pay Laborers, Workers and Mechanics Performing Services on Public Works Projects No Less Than the Current "Prevailing Rate of Wages" (Hourly Cash Wages Plus Amount for Fringe Benefits) in the County Where the Work is Performed. All Contractors and Sub-contractors Rendering Services Under This Contract Must Comply With All Requirements of the Act, Including but Not Limited to, All Wage, Notice and Record Keeping Duties. Questions, please contact ARCON Associates, Inc. Mr. Gaspare Pitrello (630) 495-1900, Ext. 210 or email gppitrello@arconassoc.com

Post-Bid

Educational

$1,000,000.00

Public - City

Renovation

27

21

18

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Temporary Parking Areas, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Safety Specialties, Fire Protection Specialties, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Projection Screens, Projectors
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Terminal Units, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Fuses
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Dewatering, Fill, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
173
Bidding Soon
2,527
All Active Projects
1,076
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

June 3, 2024

img_map_placeholder

500 W Bryn Mawr Ave, Roselle, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

FaCS Renovations Re-Bid at Lake Park High School West Campus

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.