BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Columbus, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of February 13, 2024 The Blueprint Eureka Fremont project will be re-advertised tomorrow. Question Deadline 01/23/2024 at 5:00 PM ET Questions pertaining to the drawings and specifications must be submitted in writing only to the City of Columbus, ATTN: Jehan Alkhayri, P.E. via email at JMAlkhayri@columbus.gov. Any questions regarding the bidding process may be sent electronically to DPUConstructionBids@columbus.gov. No phone calls will be accepted. PROJECT (CIP) NUMBER: 650870-100802 & 650870-153002 690236-100143 & 530282 - 100147 WPCLF PROJECT NUMBER: CS390274-0273 WSLRA PROJECT NUMBER: FS390274-0389 Allows zero unit prices and labor Yes Allows negative unit prices and labor No The City of Columbus (hereinafter "City") is accepting bids for Blueprint hilltop - Eureka/ fremont area integrated solution, permeable pavers, water line improvements, & resurfacing the work for which consists of the construction of permeable paver, regional basins, curb, resurfacing, sidewalk, water main, and all other such work as may be necessary to complete the contract, in accordance with the drawings, technical specifications, special provisions, and City of Columbus Construction and Material specifications set forth in this Invitation For Bid (IFB). The MBE/WBE Goal for this project is: 13% OEPA MBE Goal: 1.3%; OEPA WBE Goal: 1.0% All work shall be substantially complete within 730 calendar days of the Notice to Proceed, with final completion to occur within 820 calendar days. The City anticipates issuing a Notice to proceed on or about in June, 2024 BID CANCELLATION AND REJECTION The City may cancel the IFB, reject any or all bids in whole or in part, waive technicalities, and/or advertise for new bids, without liability to the City and when in the best interest of the City up until the time the contract is executed by the City. The City shall have 180 calendar days from the date of the bid opening to provide the bidder a Notice of Intent to Award. During this 180 day period, the bidder agrees to hold their bid prices. THIS PROJECT CONSISTS OF THE CONSTRUCTION OF NEW STORM SEWERS, INSTALLATION OF PERMEABLE PAVEMENTS, AND ASPHALT RESURFACING. THE PROJECT ALSO INCLUDES THE INSTALLATION OF NEW WATERLINES, SERVICES, AND HYDRANTS. TREE REMOVAL AND REPLACEMENT, AS WELL AS SIDEWALK REMOVAL AND REPLACEMENT ARE INCLUDED AS A RESULT OF THE CONSTRUCTION OF THE OTHER ITEMS. DOW #19-109

Award

Water / Sewer

$21,774,462.00

Public - City

Paving, Site Work

277

3

10

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
44
Bidding Soon
1,211
All Active Projects
397
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Columbus, OH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.