BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Saint Martinville, Louisiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Work Shall Consist of the Rehabilitation (Mill, Patch and Overlay) or Reconstruction of Several Roads in St. Martin Parish. Approximate Quantities Shall Include 600-Tons of Pavement Patching, 65,000-Square Yards of Asphalt Milling, 17,000-Tons of Superpave Asphaltic Concrete (Modified), 32,000-Linear Feet of Scarifying, Pulverizing, Shaping, and Compacting Roadbed, 72,000-Square Yards of Pulverizing and Processing Soil Cement Base, 16,000-Barrels of Portland Cement, and Associated Work. No Pre-Bid Conference will be held on this project. Only the bids of Contractors licensed under Louisiana Contractor's Licensing Law under Chapter 24 of Title 37 of the Louisiana Revised Statutes will be considered for bids exceeding $50,000.00. Should the bid exceed $50,000.00, Contractors desiring to bid shall hold license of proper classification under "Highway, Street, and Bridge Construction" in full force and effect at the time drawings, specifications, and forms are requested from the office of the Engineers. As evidence of good faith of the bidder, a "Bid Guarantee" equivalent to 5% of the base bid plus any additive alternates, consisting of a firm commitment, such as a bid bond, certified check, or cashier's check, shall accompany each bid as assurance that the bidder will, upon acceptance of his bid, execute such contractual documents as may be required and within the time specified. If a bid bond is used, it shall be written by a surety or insurance company currently on the U.S. Department of the Treasury Financial Management Service list of approved bonding companies, which is published annually in the Federal Register, or by a Louisiana domiciled insurance company with at least an "A-" rating in the latest printing of the A.M. Best's Key Rating Guide to write individual bonds up to 10% of policyholders' surplus, as shown in the A.M. Best's Key Rating Guide, or by an insurance company in good standing licensed to write bid bonds which is either domiciled in Louisiana or owned by Louisiana residents. The successful Contractor will be required to execute a Performance Bond and a Payment Bond in the full amount of the contract as more fully defined in the Bidding Documents. For assistance on how to register on-line or if encountering problems with the web site, contact 225.810.4814 or 866.570.9620. Properly licensed contractors submitting bids electronically are required to provide the same documents as contractors submitting through the mail or by hand delivery. These items include the Bid Form, Bid Security with Power of Attorney Certification, and Certificate of Resolution/Authority. Regardless of the bid results, the Contractor will have 48-hours from opening of bids to provide the Owner the original documents. If a certified check or cashier's check is submitted as the bid security, electronic copies of both the front and back of the check shall be included with the electronic bid. If a Contractor fails to provide the original hard copies of these documents within 48-hours of the bid opening, bid shall be considered non-responsive. Document Notes : On other sets of documents furnished, the deposit ($75.00) less the actual cost of reproduction ($70.00), shall be refunded upon return of the documents no later than 10-days after receipt of bids. Complete Bid Documents for this project are also available in electronic form and may be obtained without charge and without deposit from Sellers & Associates, Inc. Plan holders are responsible for their own reproduction costs. Plans-Out shall be directed to: ohabetz@sellersandassociates.com. Project questions shall be directed to the Design Engineer: tjsavoy@sellersandassociates.com. Bidding documents shall be available until twenty-four (24) hours before the bid opening date (R.S. 38:2212.G.(2)). No bidder may withdraw his bid for at least 45-days after the time scheduled for the opening of bids (R.S. 38:2215.A). Each bid shall be submitted only on the Louisiana Uniform Public Work Bid Form provided in the specifications. The Owner reserves the right to reject any and all bids for just cause (R.S. 38:2214.B). In accordance with R.S. 38:2212.B.(1), the provisions and requirements of this section and those stated in the bidding documents shall not be waived by any public entity.

Post-Bid

Roads / Highways

$600,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
32
Bidding Soon
326
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2024

February 26, 2024

img_map_placeholder

Multiple Locations, Saint Martinville, LA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.