Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 5, 2024 at 7:00 PM

Updated October 18, 2024

Site work for a bridge / tunnel in Seattle, Washington. Completed plans call for site work for a bridge / tunnel.

Seismic retrofit of bridge substructure components including strengthening of reinforced concrete crossbeams, footings, and columns, and micropile foundations. Water main work including installing line stop and butterfly valve for existing 30" water main. Question Deadline 01/27/2024 at 5:00 PM PT Questions must be emailed. Project Location: 15th Ave. NE over Thornton Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$6,803,147.00

Public - City

Site Work

58

22

10

5

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
126
Bidding Soon
2,100
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

March 1, 2024

Project location map

15th Ave NE, Seattle, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed