BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Southborough, Massachusetts. Completed plans call for site work for a water / sewer project.

The work includes: The Sudbury Reservoir impounds the emergency Sudbury Reservoir in Southborough Massachusetts. The 300-foot long ashlar granite and grouted rubble gravity spillway section is located in the north-central portion of the dam. The upstream crest and downstream spillway has deteriorated mortar joints that must be repaired. The downstream spillway face has missing and nonfunctioning weep holes, efflorescence, and vegetation that must be addressed. The spillway will also require cleaning in advance of repointing and repairs. There is also some repointing required on the downstream training walls and upstream gatehouse. Inside the gatehouse, the discharge deflection plate on Wet well #3 and the internal vent pipe have failed and must be rebuilt for efficient discharge. The estimated project cost is: $1,600,000.00 The contract duration is 180 calendar days from the Notice to Proceed date. DESCRIPTION OF WORK A. The Work required by the Plans and Specifications shall include furnishing all labor, skill, supervision, tools, required permits, testing, construction plant, equipment and materials and performing all operations necessary to complete the Work as shown on the Plans and Specifications, and as required by the Authority. The Work shall generally consist of, but not be limited to, the following: 1. Establish erosion and sedimentation control measures including, but not limited to compost filter sock and turbidity curtain as shown on contract drawings. 2. Coordinate work with MWRA, including lowering of reservoir level to allow all work to occur in the dry, as directed. 3. Provide scaffolding and other equipment as necessary to safely access and complete the Work. The Contractor shall provide MWRA safe access to inspect all portions of the Work. The Contractor shall not use any Authority-Owned hoisting equipment in the gatehouse. Existing anchors in the dam masonry shall be evaluated by the Contractor for safety prior to and during usage. 4. Clean efflorescence at areas above water level at upstream and downstream spillway, downstream training (wing) walls below weep holes, and at the Gatehouse walls below Elevation 266.0. 5. Clean weep holes, replace weep holes as shown on the drawings, and install new weep holes as directed by the Authority. 6. At the spillway, remove piezometers PZ-01-1 at GZ-01 and PZ-11-1 at GZ11, and repair masonry. 7. Repoint deteriorated masonry joints at upstream and downstream spillway, training walls, exterior gatehouse walls and the splash wall as shown on contract drawings. 8. Slush grout at joints in stone masonry at base of dam near the bell mouth as shown on the drawings. The purpose of this project is to perform maintenance-level activities on the Sudbury Reservoir Dam spillway and inside the gatehouse in order to bring the dam into compliance with Massachusetts Dam Safety Regulations and to help provide future safety of the public. For additional details relative to the project, see Attachment B: Project Narrative The Work will be carried out at the following location: 1. Sudbury Reservoir Dam Spillway and Gatehouse in Southborough, Massachusetts.

Bid Results

Water / Sewer

$1,955,000.00

Public - State/Provincial

Site Work

25

15

2

7

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
625
Active Projects
382
Bidding Soon
5,032
All Active Projects
2,041
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 24, 2024

March 25, 2024

September 21, 2024

img_map_placeholder

266 Boston Rd, Southborough, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.