BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Lincolnshire, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Village will resurface Anglican Lane, Brunswick Lane, Windsor Drive, and Canterbury Lane as part of the Windsor Drive drainage improvement project. Other roadways to be included in the 2024 program will be determined in the coming months as the allowable scope of work on the Windsor Drainage project is finalized with the grant managers. This project is included in the city’s 2024-2028 Capital Improvement Program (CIP). As of September 30, 2024, per owner, the project is ongoing and will be completed in June 2025. Design team and contractor have been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Roads / Highways

$710,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
515
Active Projects
299
Bidding Soon
3,692
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2024

Project location map

Windsor Dr, Lincolnshire, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.