BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2024 at 7:00 PM

Updated May 22, 2024

Site work and paving for a mixed-use development in Des Peres, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Scope of Work consists of the removal and replacement of slabs on three adjacent streets, totaling 1,286 SY of concrete pavement. Traffic control and other incidental items shall be included as shown in the specifications. The anticipated notice to proceed date is May 13th, 2024. Not less than the prevailing hourly rate of wages shall be paid to all workers performing under this Contract in this area according to the rates determined by the Department of Labor and Industrial Relations of the State of Missouri. Each bid shall be accompanied by a certified check or bank draft on a responsible solvent bank or a satisfactory bid bond executed by the bidder and Surety company and payable to the City of Des Peres, Missouri, in the amount of not less than ten percent (10%) of the base bid plus the greatest of the alternate bids. If the bidder fails to enter into a contract with the City on the terms stated in his bid, or fails to furnish a performance bond as required by the Contract Documents, the amount of the Bid Bond shall be forfeited to the City as liquidated damages, not as a penalty. The City reserves the right to accept or reject any bid and to waive any irregularities in the best interest of the City. Approximate Value: $125,000 The City shall have the right to reject any or all bids, to reject a bid not accompanied by a Bid Bond or by other data required by the Bidding Documents, to reject a bid which is in any way incomplete or irregular and to rebid the Work at a later date if all bids are rejected. The Contractor shall furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Sum as security for the faithful performance of this Contract and also a Labor and Material Payment Bond in an amount not less than one hundred percent (100%) of the Contract Sum in a penal sum not less than that prescribed by State or local law, as security for the payment of all persons performing labor on the project under this Contract and furnishing materials in connection with this Contract. The Surety shall be a company licensed to do business in the State of Missouri and shall be acceptable to the City. The Performance Bond and the Labor and Material Payment Bond may be in one or in separate instruments.

Award

Roads / Highways

$105,388.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
115
Bidding Soon
1,273
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

May 13, 2024

Project location map

Multiple Locations, Des Peres, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.