BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a clubhouse / community center in Sacramento, California. Completed plans call for the renovation of a clubhouse / community center.

**As of April 3, 2024, this project has not yet been awarded. Pending contract agreement approval by Board of Directors Fusion Electric Inc. is the contractor that will be awarded the contract.** **As of March 12, 2024, this project has not yet been awarded. A timeline for the award has not yet been established.** Question Deadline 02/12/2024 All questions prior to award of the Agreement shall be directed to the attention of the undersigned Contract Officer via email at rlincoln@southgaterecandpark. Pat O'Brien Community Center and Other Facilities Photovoltaic System 8025 Waterman Road, Sacramento Purchase, Installation, and Commissioning of Approximately 75 - 150 kWDC of Rooftop Photovoltaic (PV) System The Southgate Recreation & Park District site consists of four (4) buildings at 8025 Waterman Road, Sacramento. The serving utility is the Sacramento Municipal Utility District (SMUD). The Photovoltaic ("PV") generation is planned to offset part of the loads on the one SMUD site electric meter. Due to the easements of high voltage power lines running across the parking areas, solar ports (solar arrays on carport structures) are not being considered. 1. The Contractor shall be responsible for the design, permitting, equipment, procurement, installation and related construction activities of the PV System. The PV System construction will be carried out by the Contractor in conformance with all applicable laws, codes, and interconnection requirements of the servicing electric utility and all CEC technical and installation specifications and guidelines. 2. The PV System will be installed in conformance with equipment manufacturer's recommendations. 3. The Contractor shall design and install an appropriate interconnection point for standard NEM Interconnection with the existing (and/or planned) electrical switchgear provided by Owner. 4. The Contractor shall provide and set up a web-based DAS/monitoring system(s) and provide the District with login access. 5. Any substitution of major components shall be of like quality and performance and subject to prior District approval. 6. The Contractor shall be responsible for submitting and obtaining approval of the Interconnection Application and obtaining the final Permission To Operate (PTO) from the servicing utility (SMUD). 7. The Contractor shall assist District in completing and submitting any appropriate incentives including the Solar Incentives under the Inflation Reduction Act (IRA). The work consists, in general, of furnishing all permits, materials, labor, services, tools, plants, supplies, equipment, management, superintendence, and all other work necessary to provide for the Pat O'Brien Community Center and Other Facilities Photovoltaic System The budget for the total project is in the range of $275,000.00. Each bid must be accompanied by a Bid Guaranty in the form of a Certificate of Deposit, Certified or Cashier's Check, Bidder's Bond or Irrevocable Standby Letter of Credit, in an amount equal to at least ten percent (10%) of the Bidder's Grand Total Bid Price. The Bid Guaranty will be retained by District and applied to any and all damages sustained by District in the event that the successful Bidder fails or refuses to enter into the Agreement awarded to it and to furnish all required bonds and Certificates of Insurance. District intends to award the Agreement to the lowest responsive, responsible Bidder based on the Base Bid Price. To the extent allowed by law, District reserves the right to reject any and all bids and/or to waive any irregularities or informalities in any bid or in the bidding procedure. District specifically reserves the right to not award the Agreement after the opening of bids. Bids will be examined and reported to the Board of Directors of District within ninety (90) days of the bid opening. Except as permitted by applicable law, no Bidder may withdraw its bid for a period of ninety (90) days after the date of bid opening. Each Bidder will be notified of any award of the Agreement by District.

Award

Clubhouse / Community Centers

$217,500.00

Public - City

Renovation

3

8

2

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
84
Bidding Soon
1,619
All Active Projects
674
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

April 15, 2024

img_map_placeholder

8025 Waterman Rd, Sacramento, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.