Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Gallup, New Mexico. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
General Information: The City of Gallup, NM is seeking bid proposals for construction of Green Street & 2nd Street Waterline Improvements 2024. This project will consist of installing a new 6-inch waterline, 8-inch waterline, and 10-inch waterlines in Green Street and 2nd Street (NM-610) in Gallup, NM. Work shall include fittings, valves, specials, trenching, backfilling, compaction, waterline tie-ins, transfer of existing water services, existing waterline removal, waterline abandonment and traffic control. Sidewalk, curb and gutter, valley gutters, drive pads, and asphalt removal will also be required. The Green Avenue waterlines consist of installing a new 6-inch waterline and a new 8-inch waterline. The new 6-inch waterline runs east from the intersection of Green Avenue and 2 Street (NM-610) to the intersection of Green Avenue and Puerco Drive, approximately 740 linear feet. The new 8-inch waterline runs east from the intersection of Green Avenue & Puerco Drive to the intersection of Green Avenue and Grandview Drive, approximately 1500 linear feet. The 2nd Street (NM-610) waterline consists of installing approximately 650 linear feet of new 10-inch waterline running south from the intersection of Green Avenue and 2nd Street (NM- 610) to the intersection of 2nd Street (NM-610) & Logan Avenue. Work shall include fittings, valves, specials, trenching, backfilling, compaction, waterline tie-ins, transfer of existing water services, existing waterline removal, waterline abandonment and traffic control. Sidewalk, curb and gutter, valley gutters, drive pads, and asphalt removal will also be required. This project is located in Gallup, New Mexico and will consist of installing two waterlines on Green Avenue between the intersections of 2 nd Street and Grandview Drive. The first waterline will consist of installing approximately 740 linear feet of new 6-inch AWW A C-900 DR-18 PV C waterline between the intersections of 2 n d Street and Puerco Drive. This will require a crossing and penetration of a stone wall drainage box with 40 feet of new 6-inch C900 DR18 Eagle Loc900 (or equal) carrier pipe in 30 feet of 10-inch steel casing with casing spacers. This item will also include two 8 foot 12-inch steel sleeves for the stone wall drainage box. A Copy of bid bond shall be submitted electronically with the bid and made payable to the owner in the amount of five percent (5%) of the bid sum. Note : Original form of bid bond shall immediately be mailed to owner once bid proposal is determined low, responsive bid. Security shall be by a certified or cashier's check or a bid bond prepared on a form acceptable to the owner, issued by a surety licensed to do business in the state where the project is located. The Contractor shall furnish a Performance Bond and a Payment Bond each in 100% of the contract amount. The Performance Bond shall also provide for a 1-year guarantee for materials and workmanship once contractor is considered substantially complete. The Bidder must agree to commence work on a date to be specified in a written "Notice to Proceed" issued by the Owner or his representatives and to fully complete the project within One Hundred Fifty (150) consecutive calendar days thereafter, including weather delays. All labor and work done by the contractor shall be warranted for a period of one year. Question Deadline 02/06/2024 at 5:00 PM MT Any clarifications and or questions on any part of the Instructions to Bidders or questions regarding the plans, specifications, and scope of work shall be submitted through online.
Post-Bid
Roads / Highways
$1,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2024
April 15, 2024
Multiple Locations, Gallup, NM
Related To This Project
Gallup, NM
Bid Date: Dec 10 2020
Gallup, NM
Bid Date: Apr 15 2024
Gallup, NM
Bid Date: Aug 23 2024
Gallup, NM
Bid Date: Jul 24 2024
Gallup, NM
Bid Date: Mar 15 2024
Gallup, NM
Bid Date: Apr 11 2024
Gallup, NM
Bid Date: Apr 02 2024
Gallup, NM
Bid Date: Apr 10 2024
Gallup, NM
Bid Date: Mar 27 2024
Gallup, NM
--
Gallup, NM
Bid Date: Jan 30 2024
Gallup, NM
Bid Date: Nov 30 2023
Gallup, NM
Bid Date: Oct 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.