EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2024 at 8:00 PM

Updated April 9, 2024

Site work and paving for a mixed-use development in Schiller Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Notice is hereby given by the President and Board of Trustees of the Village of Schiller Park, Cook County, Illinois, that sealed bid proposals will be received for the following improvement: 2024 CONCRETE IMPROVEMENTS The work shall take place on several alleys as well as on several miscellaneous streets and parking lots throughout the Village in Schiller Park. The scope of work includes earth excavation, pavement removal, curb and gutter removal and replacement, PCC garage apron removal and replacement, PCC sidewalk removal and replacement, PCC alley pavement, edge grade adjustment, aggregate base course, type B, geotechnical fabric, hot mix asphalt surface, topsoil, sod, construction videotaping, installation of new 15" storm sewer, installation of new 12" D.I.P. storm sewer, metal trench grate, RDCB, connect new storm sewer pipe to existing structure and traffic control and protection Proposals must be submitted on the forms provided. No proposals will be issued after 4:00 P.M., on Monday the 5th day of February 2024. All bid proposals offered must be accompanied by a bid bond, cashier's check, or certified check payable to the Village of Schiller Park in an amount which shall not be less than Ten Percent (10%) of the total amount of the bid, as a guarantee that if the bid is accepted by the Village, a contract will be entered into with the Village. No bid proposal shall be considered unless accompanied by such a bid bond or check. No bid shall be withdrawn after the opening of the Proposals without the consent of the President and Board of Trustees of the Village of Schiller Park for a period of sixty (60) days after the scheduled time of bid opening. The Contractor and Subcontractor shall comply with all regulations issued pursuant to Prevailing Wage Act (820 ILCS 130), and other applicable Federal Laws and regulations pertaining to labor standards. The Village of Schiller Park reserves the right to determine the lowest, responsive, and responsible bidder, to waive irregularities and to reject any or all bid proposals. Work on the project shall be prosecuted in such manner and with sufficient materials, equipment, and labor to insure its completion by May 31, 2024. This schedule is based upon a presumed Award of Contract on February 15, 2024

Bid Results

Sidewalks / Parking Lot

$385,530.00

Public - City

Paving, Site Work

1

6

5

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Sodding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
135
Bidding Soon
2,343
All Active Projects
990
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

April 8, 2024

img_map_placeholder

Multiple Locations, Schiller Park, IL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2024 Concrete Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.