BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a civil project in Inman, South Carolina. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for site work for a water / sewer project; and for the renovation of a water / sewer project.

Upgrade and capacity expansion of the existing WWTP from a capacity of 1.0 MGD to 1.5 MGD, other associated work for a complete and proper installation. Questions concerning the plans and specifications should be emailed to Rich Anderson at randerson@summitengineeringgroup.com at least ten days prior to bid opening. Construction Cost Range: $16M - $20M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Upgrade and capacity expansion of the existing influent and transfer pump stations, installation of a new 1.0 MG equalization basin with associated aeration system, construction of a new 0.500 MGD aeration basin utilizing a jet aeration system, construction of two 45ft. diameter center-feed secondary clarifiers, construction of a new returned activated sludge pump station, construction of a new effluent structure consisting of chlorination, de-chlorination, post aeration, non-potable water supply system, flow monitoring and sampling, installation of associated site and grading work, site piping and other utility improvements, construction of various concrete structures for flow diversion and control, installation of an expanded and upgraded electrical / instrumentation / SCADA networks, installation of a new emergency generator set, construction of a maintenance building addition, maintenance and material replacement of an existing sewer pump station, abandonment of several existing WWTP structures, relocation of existing process equipment, and other associated work all as needed to upgrade and expand the existing WWTP from a capacity of 1.0 MGD to 1.5 MGD. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Post-Bid

Water / Sewer

$16,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

207

30

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
51
Bidding Soon
1,089
All Active Projects
535
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

May 20, 2024

img_map_placeholder

1350 Campton Rd, Inman, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.