EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 17, 2024 at 7:00 PM

Updated October 1, 2024

Site work, paving and outdoor lighting for a mixed-use development in Surprise, Arizona. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City of Surprise invites qualified firms to submit a Statement of Qualifications (SOQ) for roadway improvements to 163rd Ave (Pat Tillman Blvd. to Jomax Rd), Surprise, Arizona. The road improvements will include roadway design, curb, gutter and sidewalks, three 12-foot travel lanes in each direction, left turn lane/raised median and bike lanes, drainage, streetlights, traffic signals and conduits, irrigation relocation, dry utilities, landscaping, and right-of-way. Question Deadline 02/08/2024 at 4:00 PM MT. The City of Surprise intends to procure a Construction Manager at Risk (CMAR) to construct the improvements for 163rd Ave (Pat Tillman Blvd. to Jomax Rd). This project will be constructed pursuant to A.R.S. 34-601 et seq. The CMAR services will be performed in two phases. Phase I, the first contract, will include the pre-construction services, preparation, and submission of the Guaranteed Maximum Price (GMP) and procurement of any long lead items. Phase II, the second contract, will include complete construction services for the construction of the Project. After being selected, the CMAR will execute a contract with Surprise to provide pre-construction services during the design phase of the project as follows: o CMAR will be a part of the Project Design Team and will participate in the Project Review and consult with Surprise staff and the Project team during Project development. o CMAR will provide value analysis services, value engineering, and offer cost savings suggestions and best value recommendations. o CMAR will provide Project planning and scheduling. o CMAR will provide constructability studies and reviews. o CMAR will assist in the coordination of Contract Documents. o At the completion of the design or at any earlier time as required by Surprise, CMAR will submit a Construction Guaranteed Maximum Price (GMP) to Surprise. o The CMAR may also be requested to provide Construction Cost Estimates based on marketplace conditions. After CMAR has submitted a Pre-Construction Guaranteed Maximum Price acceptable to Surprise, CMAR and Surprise intend to execute a second contract for complete construction services for the construction of the project. The CMAR will assume the risk of delivering the Project through a guaranteed maximum price contract. The CMAR will be responsible for construction means and methods. The City of Surprise has engaged Kimley-Horn, TYLin and AZTEC to complete the design. Estimated Project schedule: o Planned date of design start: Currently in design o Planned date of design completion: June 2024 o Planned date of construction start: July 2024 o Planned date of construction completion: November 2025

Post-Bid

Roads / Highways

$250,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
25
Bidding Soon
671
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFQ Construction Manager at Risk (CMAR) - CMAR Road Improvements 163rd Avenue - Pat Tillman Blvd to Jomax Road

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.