EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 15, 2024 at 7:00 PM

Updated October 1, 2024

Demolition, site work and addition to a municipal facility in Metomen, Wisconsin. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; and for site work for a municipal facility.

Estimated cost range is $500,000 to $600,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions Due 02/07/2024 @ 2:00 PM Any questions to the Port may be submitted to the Procurement Department through the Procurement and Question Submission Portal. Scope of Work: The Work required for this Project includes: Demolition and disposal of Buildings 459A and 459B, not including slabs and foundations; abatement of Regulated Building Materials; disconnection of utilities, and installation of a chain-link fence with a gate. Contact Any questions to the Port may be submitted to the Procurement Information: Department through the Procurement and Question Submission Portal (Portal link is accessible via this specific procurements website. See left side of page.). A direct link is also available here: Procurement and Question Portal Link. No oral responses will be binding by the Port. Instructions for utilizing the portal can be found here: Procurement and Question Submission Portal Instructions. Questions will not be accepted after seven (7) days prior to the Bid Date. Public Works Effective July 1, 2019, all businesses are required to have training Training before bidding on public works projects and prevailing wage under Requirements: RCW 39.04.359 and RCW 39.12, or is on the list of exempt businesses maintained by the Department of Labor and Industries. The bidder must designate a person or persons to be trained on these requirements. The training will be provided by the Department of Labor and Industries or by a training provider whose curriculum is approved by the Department of Labor and Industries. CONTRACT TIME AND LIQUIDATED DAMAGES The Contractor shall achieve all interim milestones as set forth in the Contract Documents and Substantial Completion of the entire Work not later than 90 calendar days from execution of the Contract, subject to adjustments of this Contract Time as provided in the Contract Documents. The Contractor shall achieve Final Completion of the entire Work within 30 calendar days of the date on which Substantial Completion is achieved. Provisions for liquidated damages as a reasonable estimate of future loss, as of the date of this Agreement, are included in the Contract Documents. The parties agree that the stated liquidated damages are reasonable and not penalties individually nor cumulatively. The liquidated damages for failure to achieve Substantial Completion by the required date shall be $400 per calendar day. After the required Final Completion date, the liquidated damages for failure to achieve Final Completion shall be $40 per calendar day. Liquidated damages assessed by the Port will be deducted from monies due to the Contractor, or from monies that will become due to the Contractor. The liquidated damages, as specified and calculated herein, shall be levied, cumulatively if applicable, for each and every calendar day that Substantial Completion and/or Final Completion of the Work is delayed beyond the required completion dates, or the completion dates modified by the Port for extensions of the Contract Time.

Post-Bid

Municipal

$600,000.00

Public - City

Addition, Demolition, Site Work

25

16

19

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
80
Bidding Soon
835
All Active Projects
452
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2024

March 15, 2024

img_map_placeholder

Multiple Locations, Metomen, WI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.