BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Metomen, Wisconsin. Completed plans call for site work for a water / sewer project.

Public notice is hereby given that the City of Kirkland has issued the above-mentioned Invitation for Bids (IFB). The work to be performed for this project consists of furnishing all labor, tools, materials, and equipment necessary for completion of the NE Juanita Dr. and 86th Ave. NE Storm Improvements Project. The City of Kirkland requires that no person shall, on the grounds of race, religion, color, national origin, sex, age, marital status, political affiliation, sexual orientation, or the presence of any sensory, mental, or physical disability be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity. The City of Kirkland further assures that every effort will be made to ensure non-discrimination in all of its programs and activities, whether those programs are federally funded or not. The estimated cost for this project is in the range of $310,000 to $380,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions regarding this project shall be submitted in writing to Citys Project Engineer via email ATrujillo@kirklandwa.gov. Questions via phone will not be accepted. Bidders shall submit questions no later than February 28, 2024. Installation of Underdrains, Storm Drainage Pipe, Catch Basins, and associated Property/Pavement Restoration o installation of approximately two hundred and forty (240) lineal feet (LF) of 8-inch diameter underdrain pipe under pavement; o installation of approximately one hundred and seventy (170) lineal feet (LF) of 8- inch diameter underdrain pipe underneath an existing ditch; o installation of approximately two hundred and seventy (270) lineal feet (LF) of 12-inch diameter storm sewer pipe under pavement; o installation of three type 1 catch basins and two type 2 catch basins, o approximately 9,750 square feet of pavement grind and overlay and replacement of associated paint markings; o other related work such as mobilization/demobilization, construction surveying, Spill Prevention, Control, and Countermeasure (SPCC) Plan, traffic control, water pollution and erosion control, bypass system, property restoration, trench / excavation protection, extruded curb replacement, pavement restoration, record documents, and any minor changes, complete in place, tested and ready for use, as needed to support the above activities within the City of Kirkland as shown in the Plans; 32300303

Bid Results

Water / Sewer

$340,091.00

Public - City

Site Work

10

12

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
32
Bidding Soon
749
All Active Projects
314
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

April 5, 2024

img_map_placeholder

86th Ave NE & Juanita Dr NE, Metomen, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.