BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Clearfield, Utah. Completed plans call for site work for a transportation facility.

This project will include the design, fabrication and installation of wayfinding monument and beacon signs to make navigating Clearfield station easier. Question Deadline 01/24/2024 at 2:00 PM MT A. Introduction UTA's transit network has continued to grow and expand since the first service was delivered in 1970. As part of this growth, UTA has added hundreds of miles of new service and several different modes of transit to the portfolio of products and services they provide, including a series of rail and bus-rapid-transit lines throughout the service area. A key component to the success of this every growing transportation network is a comprehensive, understandable, and easily recognizable wayfinding system. An effective wayfinding system provides a sense of familiarity, comfort, and safety. Finding one's way to the UTA transit system, navigating through the system, and knowing where to go once you have arrived at your destination should require minimal mental effort. Background At times throughout the history of the agency, the system has grown and evolved at a rapid pace. In these times of accelerated growth, decisions regarding certain elements of UTA's wayfinding system needed to be expedited in lieu of a comprehensive evaluation of a complete system-wide wayfinding solution. This decision-making process left many parts of the UTA service area looking different from other parts. There was a need for a more cohesive strategy, plan, and consistent implementation of UTA's design guidelines that will produce a unified wayfinding and signage solution for UTA. In 2019 UTA contracted with a professional wayfinding planning and design firm (Applied Wayfinding) to develop a comprehensive set of design guidelines that would make for a consistent, easily recognized set of wayfinding elements. B. Scope of Work o Contractor shall perform the Work as depicted in Exhibit A o Each of the sign locations on the platforms are show in Exhibit A o Contractor shall provide a fabrication and installation schedule. o "Work" also includes all services required by the Contract Documents, including procuring, and furnishing all material, equipment, services and labor reasonably inferable from the Contract Documents as necessary to complete fabrication and installation of the Projects o Contractor shall produce shop drawings of each sign type, including hardware and mounting procedure to be provided to UTA PM for review and approval before fabrication Project Description This project will include the design, fabrication and installation of wayfinding monument and beacon signs to make navigating Clearfield station easier. Project Start Date Feb/Mar 2024 *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Transportation Terminals

$165,000.00

Public - State/Provincial

Site Work

12

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
70
Bidding Soon
997
All Active Projects
402
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 9, 2024

March 11, 2024

img_map_placeholder

1250 State St, Clearfield, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.