Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2024 at 8:00 PM

Updated April 11, 2024

Site work and paving for a mixed-use development in Saint Martins, Missouri. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

ADA Compliant Trail Connection and Improvements The proposed work involves construction of a new 7' wide concrete trail spur in Niekamp Park. The project will also include construction of a portion of gravel and concrete parking lot to accommodate handicap accessible stalls, seeding, and erosion control. There is also an accessible route from the trail to the parking area. All equipment, material and workmanship must be in accordance with the plans, specifications, and contract documents. All questions concerning the bid document preparation can be directed to the office of City of St. Martins at (573) 893-6465. Project specific questions can be directed to Austin Johnson, PE of Bartlett & West, Inc. at (573) 659-6737 The wage rates applicable to this project have been predetermined as required by law. The city will make every effort possible to solicit bids from minority MBE/WBE businesses. If the contract is to be awarded, owner will award the contract to the lowest, responsive, responsible bidder. Federal funds are being used in the project, and all relevant federal, state and local requirements apply. St. Martins hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on thegrounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. If submitting the bid by mail, it is to be completed, executed, and submitted in a sealed envelope addressed to City of St. Martins. City of St. Martins, 6909A Business 50 West, St. Martins, MO 65109, (573)893-6465, Cole County, Niekamp Park Trail on the outside of the envelope.

Post-Bid

Playgrounds / Parks / Athletic Fields

$400,000.00

Public - City

Paving, Site Work

10

12

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
46
Bidding Soon
709
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

March 14, 2024

Project location map

Niekamp Park, Saint Martins, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed