BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Renovation of a library in San Rafael, California. Completed plans call for the renovation of a library.

As of September 19, 2025, this project is to begin construction after September 27, 2025, and complete in the spring/summer of 2026. An architect and general contractor have been named. The closed solicitation is listed below for reference: _______________ The City of San Rafael is seeking proposals from qualified consultants for Architectural, Engineering, and Interior Design Services for the Pickleweed Branch Library Re-Design Project. Pickleweed Library is located at 50 Canal Street in the Canal neighborhood, a vibrant and diverse area that has traditionally been marked by socio-economic disparities compared to the rest of San Rafael. Pickleweed Library is 2,000 square feet, co-located with the Albert J. Boro Community Center and within Pickleweed Community Park, and serves a local community of over 12,000 residents. The City has secured $2,000,000 in total project funding to reconfigure the interior space in the Pickleweed Branch Library to improve both staff and public space. The project will require creative approaches to reimagine and redesign the existing spaces at the library to better serve the needs of staff and the community and to create a welcoming environment for all. Questions Due January 24, 2024 at 2:00PM 1. The consultant shall be responsible for providing all contract management and quality control services throughout the duration of the project. The consultant shall deliver a high-quality product within budget and on schedule. 2. The consultant shall meet regularly with relevant City staff to discuss the project, present design options, review alternatives, etc. 3. The consultant shall coordinate with City-identified vendors to ensure project plans do not conflict with other ongoing or planned improvements. 4. The consultant shall provide monthly schedule updates in conjunction with submittals of invoices.

Award

Library

$2,301,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
400
Active Projects
146
Bidding Soon
3,128
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2025

Project location map

50 Canal St, San Rafael, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.