BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Saint Peter, Minnesota. Completed plans call for the renovation of a 41,600-square-foot residential development.

Resolicitation of Construction Manager at Risk services for preconstruction and construction for the remodel of the Sunrise North & West & Tomlinson buildings at the MSOP in St. Peter, Minnesota. Question Deadline 02/12/2024 at 3:00 PM CT Project Description The Department of Administration, on behalf of the MN Department of Human Services, is seeking Construction Manager at Risk services for preconstruction consulting and construction for the remodel of the Sunrise North & West & Tomlinson buildings at the MSOP in St. Peter, Minnesota. Sunrise Building: The north and west wings of the Sunrise building will be completely gutted and remodeled to incorporate a housing area with 30 client beds, a dining area and staff office space, similar to previous phases in Sunrise and Green Acres, as well as a health services clinic. All existing interior partitions, ceilings and finishes will be removed in these areas to accommodate the new design, and HVAC, plumbing and electrical systems in these areaswill be replaced. The fire sprinkler system installed in a past phase will be extended to the remainder of the building. To improve thermal performance of the building envelope and comply with the sustainability standards for state buildings, the exterior windows and doors will be replaced, and insulated furring will be added around the inside of the exterior walls. The existing roofing will remain and be patched as needed in conjunction with the mechanical work. The area to be renovated is approximately 20,700 sf on the main floor, but mechanical and electrical work in the basement and mechanical penthouse will also be involved. Tomlinson Building: The renovation in Tomlinson will include a visitation space, recreational therapist's office, fitness space for staff, several multipurpose spaces and upgrading the public toilet rooms to meet current code requirements. Existing interior partitions will be completely removed in some areas of the building to accommodate the new design, while in other areas many of the partitions and doors will remain. Ceilings, finishes, exterior windows and doors, and HVAC, plumbing and electrical systems will be replaced throughout most of the building. A new fire sprinkler system will be installed throughout the building. Several mechanical units will be installed on the roof. The existing roofing will remain and will be patched as needed in conjunction with the mechanical work. The main floor is approximately 20,900 sf. Tomlinson has a small basement but work on that level will be limited to mechanical and electrical systems. Select portions of the work may be indicated as alternate bid items. 1. Architect of Record Scope of Parallel Design Efforts Awarded to BWBR Architects. The current schedule has BWBR Architects working through the CD phases during CM at Risk selection process. Currently schedule suggests the CM at Risk will be on board by early-March 2024. 2. Project Location Information MSOP, 100 Freeman Dr., St. Peter, Minnesota

Post-Bid

Residential Subdivision

$18,900,000.00

Public - State/Provincial

Renovation

4

11

4

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
56
Bidding Soon
1,458
All Active Projects
498
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 21, 2024

June 1, 2024

July 31, 2025

img_map_placeholder

100 Freeman Dr, Saint Peter, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.