BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a playground / park / athletic field in Lake Forest, California. Completed plans call for site work for a playground / park / athletic field.

The Contractor Shall Perform All Work Within the Time Stipulated the Contract and Shall Provide All Labor, Materials, Equipment, Tools, Utility Services, and Transportation to Complete All of the Work Required in Strict Compliance With the Contract Documents as Specified in ''component Parts of the Contract'' Section Below for the Following Project: City of Lake Forest Pittsford Park Shade Structure Canopy Replacement Project, Pw 2023-09 The Contractor and Its Surety Shall Be Liable to City for Any Damages Arising as a Result of the Contractor's Failure to Comply With This Obligation. The Successful Bidder Will Be Required to Furnish City With a Performance Bond Equal to 100% of the Successful Bid, and a Payment Bond Equal to 100% of the Successful Bid, Prior to Execution of the Contract. All Bonds Are to Be Secured From a Surety That Meets All of the State of California Bonding Requirements, as Defined in Code of Civil Procedure Section 995.120, and is Admitted by the State of California. The Contractor shall perform all Work within the time stipulated the contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in "COMPONENT PARTS OF THE CONTRACT" section below for the following Project: City of Lake Forest Pittsford Park Shade Structure Canopy Replacement Project, PW 2023-09 The Contractor and its surety shall be liable to City for any damages arising as a result of the Contractor's failure to comply with this obligation.

Bid Results

Playgrounds / Parks / Athletic Fields

$221,000.00

Public - City

Site Work

13

5

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
113
Bidding Soon
2,444
All Active Projects
1,091
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

March 25, 2024

img_map_placeholder

21701 Pittsford Dr, Lake Forest, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.